Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

Czech Republic: planned lifts

All planned lifts in the Czech Republic - Lift projects at ski resorts in the Czech Republic (renewal, development and integration)


Overview: planned ski lifts in the Czech Republic

Total: 7
1
4
2

Add lifts and cable cars? Please report here


See also:
New lifts 2015/2016



Czech Republic - expand to (number of planned ski lifts):

Map: planned ski lifts in the Czech Republic

Czech Republic - limit to (number of planned ski lifts):

Czech Republic: planned ski lifts

1-5 out of 5 ski resorts

planned: Loučná-Přemostěná (Bj. 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2700 m · Carrying capacity/hour: 2400

planned: Fuchsloch-Fichtelberg (Bj. 2019)

4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400

planned: Fuchsloch-Klínovec (Bj. 2019)

4pers. Chairlift (fixed-grip)
Carrying capacity/hour: 2400
All lifts

planned: Javori Dul (Bj. 2016)

T-bar
Carrying capacity/hour: 1200
All lifts

planned: Saxner Express (Bj. 2015)

4pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

planned: Certova Hora

4pers. Chairlift (fixed-grip)
Length: 800 m · Carrying capacity/hour: 2400
All lifts

planned: Tetřeví vrch (Bj. 2015)

T-bar
Length: 500 m · Carrying capacity/hour: 1400
All lifts
    1-5 out of 5 ski resorts