Change lift info:

Bregenz Forest/Bregenzerwald: planned lifts

All planned lifts in the Bregenz Forest/Bregenzerwald - Lift projects at ski resorts in the Bregenz Forest/Bregenzerwald (renewal, development and integration)


Overview: planned ski lifts in the Bregenz Forest/Bregenzerwald

Total: 5
5

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Bregenz Forest/Bregenzerwald - expand to (number of planned ski lifts):

Map: planned ski lifts in the Bregenz Forest/Bregenzerwald

Show map

Bregenz Forest/Bregenzerwald: planned ski lifts

1-1 out of 1 ski resorts

planned: Flexenbahn (Verbindungsbahn Arlberg Ost und West) (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

planned: Trittkopfbahn II (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 900 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Ski resort: Lech/Zürs/Warth/Schröcken [Zürs]

planned: Trittkopfbahn I (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1900 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Lech/Zürs/Warth/Schröcken [Zürs]
Replacement lift: 30pers. Aerial tramway/Reversible ropeway

planned: Schlosskopfbahn

8pers. Gondola lift (monocable circulating ropeway)
Length: 1414 m · Carrying capacity/hour: 2400
Ski resort: Lech/Zürs/Warth/Schröcken [Lech]
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Zugerbergbahn

8pers. Gondola lift (monocable circulating ropeway)
Length: 1460 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Lech/Zürs/Warth/Schröcken [Lech]
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
1-1 out of 1 ski resorts