Change lift info:

Tyrol's Zugspitz Arena: planned lifts

All planned lifts in Tyrol's Zugspitz Arena - Lift projects at ski resorts in Tyrol's Zugspitz Arena (renewal, development and integration)


Overview: planned ski lifts in Tyrol's Zugspitz Arena

Total: 3
1
1
1

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Tyrol's Zugspitz Arena - expand to (number of planned ski lifts):

Map: planned ski lifts in Tyrol's Zugspitz Arena

Show map

Tyrol's Zugspitz Arena: planned ski lifts

1-2 out of 2 ski resorts

planned: Eibseeseilbahn (YOC 2017)

120pers. Aerial tramway/Reversible ropeway
Length: 4453 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Replacement lift: 45pers. Aerial tramway/Reversible ropeway

planned: Weißes Tal (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Length: 1250 m · Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts

planned: Gamskar-Bahn

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts
1-2 out of 2 ski resorts