Change lift info:

Styria: planned lifts

All planned lifts in Styria - Lift projects at ski resorts in Styria (renewal, development and integration)


Overview: planned ski lifts in Styria

Total: 4
1
3

Add lifts and cable cars? Please report here


See also:
New lifts 2016/2017



Styria - expand to (number of planned ski lifts):

Map: planned ski lifts in Styria

Show map
Styria - limit to (number of planned ski lifts):

Styria: planned ski lifts

1-3 out of 3 ski resorts

planned: Burgstallalmbahn (YOC 2016)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1039 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Schladming – Planai/​Hochwurzen/​Hauser Kaibling/​Reiteralm (4-Berge-Skischaukel) [Planai]
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

planned: Grebenzen (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
Manufacturer: Leitner

planned: Grebenzenbahn 2 (YOC 2016)

2pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 1200
All lifts

planned: Gläserboden

6pers. High speed chairlift (detachable)
Length: 1300 m · Carrying capacity/hour: 2800
Replacement lift: T-bar
All lifts
1-3 out of 3 ski resorts