Change lift info:

Central Switzerland: planned lifts

All planned lifts in Central Switzerland - Lift projects at ski resorts in Central Switzerland (renewal, development and integration)


Overview: planned ski lifts in Central Switzerland

Total: 10
1
1
2
5
1

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Central Switzerland

Show map
Central Switzerland – limit to

Central Switzerland – switch to

Central Switzerland: planned ski lifts

1-5 out of 5 ski resorts

planned: Jochpass-Ober Grumm

4pers. High speed chairlift (detachable)


planned: Engstlenalp-Schafthal

4pers. High speed chairlift (detachable)

All lifts

planned: Standseilbahn Schwyz-Stoos (YOC 2017)

100pers. Funicular
Length: 1304 m · Carrying capacity/hour: 1500
Manufacturer: Garaventa
Replacement lift: 97pers. Funicular
All lifts

planned: Mythenregion (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

planned: Andermatt–Nätschen (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Nätschen–Gütsch (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. High speed chairlift (detachable)

planned: Vordere Felli–Schneehühnerstock (YOC 2018)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000

planned: Hinterbördli–Strahlgand (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2000

planned: Trainerlift Nätschen (YOC 2017)

T-bar
Carrying capacity/hour: 1000
All lifts

planned: Kräbel-Rigi Scheidegg (YOC 2017)

15pers. Aerial tramway/Reversible ropeway
Length: 1745 m · Carrying capacity/hour: 300
Manufacturer: Garaventa
Replacement lift: 15pers. Aerial tramway/Reversible ropeway
All lifts
1-5 out of 5 ski resorts