Change lift info:

Central Switzerland: planned lifts

All planned lifts in Central Switzerland - Lift projects at ski resorts in Central Switzerland (renewal, development and integration)


Overview: planned ski lifts in Central Switzerland

Total: 8
2
1
4
1

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Central Switzerland

Show map
Central Switzerland – limit to

Central Switzerland – switch to

Central Switzerland: planned ski lifts

1-6 out of 6 ski resorts

planned: Jochpass-Ober Grumm

4pers. High speed chairlift (detachable)


planned: Engstlenalp-Schafthal

4pers. High speed chairlift (detachable)

All lifts

planned: Witmoos-Rothorn (YOC 2019)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2800 m · Carrying capacity/hour: 1000
Replacement lift: 80pers. Aerial tramway/Reversible ropeway

planned: Witmoos-Witenlauenen (YOC 2018)

4pers. High speed chairlift (detachable)
Carrying capacity/hour: 1500
All lifts

planned: Mythenregion (YOC 2017)

6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: T-bar
All lifts

planned: Trainerlift Nätschen (YOC 2018)

T-bar
Carrying capacity/hour: 1000
All lifts

planned: Kräbel-Rigi Scheidegg (YOC 2017)

15pers. Aerial tramway/Reversible ropeway
Length: 1745 m · Carrying capacity/hour: 300
Manufacturer: Garaventa
Replacement lift: 15pers. Aerial tramway/Reversible ropeway
All lifts

planned: Küssnacht-Seebodenalp (YOC 2018)

15pers. Aerial tramway/Reversible ropeway
Length: 2181 m · Carrying capacity/hour: 150
Replacement lift: 10pers. Aerial tramway/Reversible ropeway
All lifts
1-6 out of 6 ski resorts