Ski resorts Belluno
Change lift info:
Belluno: planned lifts
All planned lifts in the Province of Belluno
Overview: planned ski lifts in the Province of Belluno
Lift projects at ski resorts in the Province of Belluno (renewal, development and integration)
Total: 6
2 4
Add lifts and cable cars? Please report here
See also:
New lifts 2023/2024
Belluno: planned ski lifts
- Belluno – limit to
Tourism region: Cortina d’Ampezzo (1)
Belluno – switch toMountain ranges: Dolomites (20), Carnic Main Crest (11)
1-3 out of 3 ski resorts
10pers. Gondola lift (monocable circulating ropeway)
Length: 2260 m
Carrying capacity/hour: 2000
Manufacturer: LEITNER
8pers. High speed chairlift (detachable) with bubble
Length: 930 m
Carrying capacity/hour: 3000
Manufacturer: LEITNER
6pers. High speed chairlift (detachable)
Length: 746 m
Carrying capacity/hour: 1800
8pers. Gondola lift (monocable circulating ropeway)
Length: 1922 m
Carrying capacity/hour: 2000
6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
6pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
1-3 out of 3 ski resorts