Select region
close
Continent
Country (optional)
Change lift info:

Asia: planned lifts

All planned lifts in Asia - Lift projects at ski resorts in Asia (renewal, development and integration)


Overview: planned ski lifts in Asia

Total: 16
4
1
10
1

Add lifts and cable cars? Please report here


See also:
New lifts 2015/2016



Asia - expand to (number of planned ski lifts):

Map: planned ski lifts in Asia

Asia - limit to (number of planned ski lifts):

Asia: planned ski lifts

1-7 out of 7 ski resorts

planned: YTL Hotel (YOC 2016)

8pers. Pulsed-movement aerial ropeway (gondola)

Manufacturer: Nippon Cable
Ski resort: Niseko United – Annapuri/Grand Hirafu/Hanazono/Niseko Village [Grand Hirafu]

planned: Village Express (YOC 2016)

Combined installation (6 pers. chair and 8 pers. gondola)
Carrying capacity/hour: 2000
Manufacturer: Nippon Cable
Ski resort: Niseko United – Annapuri/Grand Hirafu/Hanazono/Niseko Village [Grand Hirafu]
All lifts

planned: Thaiwoo 2 (YOC 2016)

4pers. High speed chairlift (detachable) with bubble


planned: Thaiwoo 1 (YOC 2016)

4pers. High speed chairlift (detachable) with bubble

All lifts

planned: Nr. 5 (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 499 m · Carrying capacity/hour: 2000

planned: Nr. 18 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1800 m · Carrying capacity/hour: 2400

planned: Nr. 17 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1600 m · Carrying capacity/hour: 2400

planned: Nr. 19 (YOC 2016)

6pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400

planned: Nr. 16 (YOC 2016)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400

planned: Nr. 15 (YOC 2016)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400
All lifts

planned: Go 2

8pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Mitarbi (YOC 2016)

6pers. High speed chairlift (detachable)
Length: 1470 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: J-bar

planned: Mitarbi (YOC 2016)

4pers. Chairlift (fixed-grip)
Length: 955 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: J-bar

planned: Mitarbi (YOC 2016)

J-bar
Length: 300 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
All lifts

planned: Cantor Glacier (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Saklikent (YOC 2016)

4pers. Chairlift (fixed-grip)

All lifts
    1-7 out of 7 ski resorts