Change lift info:

Asia: planned lifts

All planned lifts in Asia - Lift projects at ski resorts in Asia (renewal, development and integration)


Overview: planned ski lifts in Asia

Total: 14
5
9

Add lifts and cable cars? Please report here


See also:
New lifts 2017/2018



Map: planned ski lifts in Asia

Show map
Asia – limit to

Asia – switch to

Asia: planned ski lifts

1-8 out of 8 ski resorts

planned: Thaiwoo 1 (YOC 2017)

4pers. High speed chairlift (detachable) with bubble


planned: Thaiwoo 2 (YOC 2017)

4pers. High speed chairlift (detachable) with bubble

All lifts

planned: Nr. 5 (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)
Length: 499 m · Carrying capacity/hour: 2000

planned: Nr. 15 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400

planned: Nr. 16 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400

planned: Nr. 17 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1600 m · Carrying capacity/hour: 2400

planned: Nr. 18 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 1800 m · Carrying capacity/hour: 2400

planned: Nr. 19 (YOC 2017)

6pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400
All lifts

planned: Kartepe

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
All lifts

planned: Go 2

8pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Silk Road Gondola (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2700 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
All lifts

planned: Cantor Glacier (YOC 2018)

8pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Saklikent (YOC 2017)

4pers. Chairlift (fixed-grip)

All lifts

planned: Sheregesh (YOC 2017)

4pers. High speed chairlift (detachable) with bubble
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
All lifts
1-8 out of 8 ski resorts