Change lift info:

Trentino-Alto Adige (Trentino-Südtirol): new lifts 2008/2009

All new lifts in Trentino-Alto Adige (Trentino-Südtirol) for the 2008/2009 - season - new lifts at ski resorts in Trentino-Alto Adige (Trentino-Südtirol) : renewal of ski lifts or ski resort expansions in Trentino-Alto Adige (Trentino-Südtirol)


Overview: new ski lifts in Trentino-Alto Adige (Trentino-Südtirol) 2008/2009

Total: 16
1
5
6
4

Add lifts and cable cars? Please report here



Map: new lift in Trentino-Alto Adige (Trentino-Südtirol)

Show map
Trentino-Alto Adige (Trentino-Südtirol) – limit to

Trentino-Alto Adige (Trentino-Südtirol) – switch to

Trentino-Alto Adige (Trentino-Südtirol): new ski lifts 2008/2009

1-11 out of 11 ski resorts

Hubertus (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1195 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Pra di Tori (YOC 2008)

4pers. High speed chairlift (detachable) with bubble
Length: 1064 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Le Pope (YOC 2008)

J-bar
Length: 553 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
All lifts

St. Christina-Col Raiser (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2257 m · Carrying capacity/hour: 2030
Manufacturer: Leitner
Ski resort: Gröden (Val Gardena) [St. Christina]
Replacement lift: 8pers. Gondola lift (monocable circulating ropeway)

Panorama (YOC 2008)

6pers. High speed chairlift (detachable) with bubble
Length: 1064 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Ski resort: Gröden (Val Gardena) [Seiser Alm]
Replacement lift: 4pers. High speed chairlift (detachable)

Campo Freina (YOC 2008)

J-bar
Length: 303 m · Carrying capacity/hour: 720
Manufacturer: Graffer
Ski resort: Gröden (Val Gardena) [Wolkenstein]
All lifts

Larici (YOC 2008)

J-bar
Length: 437 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Ski resort: Madonna di Campiglio/​Pinzolo/​Folgàrida/​Marilleva [Madonna di Campiglio]
All lifts

Doss dei Cembri (YOC 2008)

4pers. Chairlift (fixed-grip)
Length: 1191 m · Carrying capacity/hour: 896
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

Masarei (YOC 2008)

6pers. High speed chairlift (detachable)
Length: 1899 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Colz (YOC 2008)

4pers. Chairlift (fixed-grip)
Length: 206 m · Carrying capacity/hour: 1720
Manufacturer: Leitner
All lifts

Panorama (YOC 2008)

6pers. High speed chairlift (detachable) with bubble
Length: 1064 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

Kuppelwies-Schwemmalm (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2673 m · Carrying capacity/hour: 2190
Manufacturer: Doppelmayr
All lifts

Ronchi-Valbona (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1202 m · Carrying capacity/hour: 2070
Manufacturer: Leitner

Valbona-Le Cune (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1512 m · Carrying capacity/hour: 2070
Manufacturer: Leitner
All lifts

Lana-San Vigilio (YOC 2008)

25pers. Aerial tramway/Reversible ropeway
Length: 2216 m · Carrying capacity/hour: 240
Manufacturer: Doppelmayr
Replacement lift: 20pers. Aerial tramway/Reversible ropeway
All lifts

Pra Alpesina-Monte Baldo (YOC 2008)

4pers. Chairlift (fixed-grip)
Length: 1025 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts
1-11 out of 11 ski resorts