Change lift info:

South Tyrol (Südtirol): new lifts 2009/2010

All new lifts in South Tyrol (Südtirol) for the 2009/2010 - season - new lifts at ski resorts in South Tyrol (Südtirol) : renewal of ski lifts or ski resort expansions in South Tyrol (Südtirol)


Overview: new ski lifts in South Tyrol (Südtirol) 2009/2010

Total: 8
3
1
3
1

Add lifts and cable cars? Please report here



Map: new lift in South Tyrol (Südtirol)

Show map
South Tyrol (Südtirol) – limit to

South Tyrol (Südtirol) – switch to

South Tyrol (Südtirol): new ski lifts 2009/2010

1-7 out of 7 ski resorts

Jochbahn (YOC 2009)

6pers. High speed chairlift (detachable) with bubble
Length: 1324 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Replacement lift: T-bar
T-bar
All lifts

Ciampinoi (YOC 2009)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1707 m · Carrying capacity/hour: 2400
Manufacturer: Agamatic
Ski resort: Gröden (Val Gardena) [Wolkenstein]
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway)

Puflatsch (YOC 2009)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 970 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
Ski resort: Gröden (Val Gardena) [Seiser Alm]
Replacement lift: 1pers. Chairlift (fixed-grip)

Plan de Tieja (YOC 2009)

J-bar
Length: 190 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Ski resort: Gröden (Val Gardena) [St. Christina]
All lifts

Ratschings-Jaufen (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1904 m · Carrying capacity/hour: 2880
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
All lifts

Marchner (YOC 2009)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1710 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Kronplatz (Plan de Corones) [Olang]
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
All lifts

Ciampai (YOC 2009)

6pers. High speed chairlift (detachable)
Length: 601 m · Carrying capacity/hour: 2002
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

Puflatsch (YOC 2009)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 970 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)
All lifts

Karjoch (YOC 2009)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1520 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
All lifts
1-7 out of 7 ski resorts