Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Select country/region »
Select region
Select country/region »

New lifts and cable cars Worldwide (221)
Season 2011/2012

Stafal-Gabiet (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2566 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Fontfroide (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Bamby (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 774 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Replacement lift: 4pers. Chairlift (fixed-grip)

Costes da l´Ega (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 568 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 3pers. Chairlift (fixed-grip)

Campolongo-Cherz I (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 979 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Hochbifangbahn (YOC 2011)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2350 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Übungslift Fichtelland (Arlhof) (YOC 2011)

J-bar
Length: 308 m · Carrying capacity/hour: 652
Manufacturer: Doppelmayr

Campolongo-Cherz I (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 979 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Rose Bowl Express (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1436 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)

Betania (YOC 2011)

T-bar
Length: 600 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Pasieka Express (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1086 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Kotelnica

Bingöl (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Superior Express #3 (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Dorukkaya (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 1160 m · Carrying capacity/hour: 1210
Manufacturer: Leitner

Kaffeehorst (YOC 2011)

T-bar
Length: 430 m · Carrying capacity/hour: 1014
Manufacturer: Doppelmayr
Replacement lift: T-bar

Versant des Épinettes (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 990 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Tiehack Express (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip) , 2pers. Chairlift (fixed-grip)

Ceraso (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 733 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Easy Way (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 274 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)

Lift F (YOC 2011)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1016 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Lift L (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1220 m · Carrying capacity/hour: 1630
Manufacturer: Doppelmayr

Lift E (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 848 m · Carrying capacity/hour: 1820
Manufacturer: Doppelmayr

La Scie-Vounetse (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1726 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Laste II (YOC 2011)

J-bar
Length: 369 m · Carrying capacity/hour: 720
Manufacturer: Leitner
Replacement lift: J-bar

Piani di Pezzè-Col dei Baldi (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1985 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Ski resort: Alleghe/Prà della Costa
Replacement lift: 4pers. High speed chairlift (detachable)

Santa Fosca (YOC 2011)

J-bar
Length: 300 m · Carrying capacity/hour: 720
Manufacturer: Leitner
Ski resort: Alleghe/Prà della Costa
Replacement lift: J-bar

Piani di Pezzè-Mariaz (YOC 2011)

J-bar
Length: 300 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Alleghe/Prà della Costa

Union Creek Express (High Point) (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1487 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpe Potor-Nuvolao (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 1110 m · Carrying capacity/hour: 1000
Manufacturer: Leitner
Ski resort: Falzarego-Lagazuoi
Replacement lift: 1pers. Chairlift (fixed-grip)

Loki Chair (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 320 m · Carrying capacity/hour: 2000
Replacement lift: 2pers. Chairlift (fixed-grip)

Dardha (YOC 2011)

J-bar
Length: 1500 m · Carrying capacity/hour: 700

Sichal Peak (YOC 2011)

6pers. Pulsed-movement aerial ropeway (gondola)
Length: 250 m · Carrying capacity/hour: 360

Chaman Gondola (YOC 2011)

4pers. Gondola lift (monocable circulating ropeway)
Length: 950 m · Carrying capacity/hour: 1800
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Ghalleh (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1100 m · Carrying capacity/hour: 1000
Replacement lift: 2pers. Chairlift (fixed-grip)

Upper Parking Lot (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 300 m · Carrying capacity/hour: 800

2nd Summit (T643) (YOC 2011)

T-bar
Length: 346 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr

Snow Arena Druskinikai (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 376 m · Carrying capacity/hour: 2200
Manufacturer: Bartholet BMF

Snow Arena Druskinikai (YOC 2011)

T-bar
Length: 300 m · Carrying capacity/hour: 1000

Übungslift Topolino I (YOC 2011)

Rope tow/ beginner lift
Length: 100 m · Carrying capacity/hour: 500
Manufacturer: SunKid

Childrenlift Sysendalen (YOC 2011)

J-bar
Length: 247 m · Carrying capacity/hour: 807
Manufacturer: Leitner

Erzincan Ergan 1 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 2611 m · Carrying capacity/hour: 1500
Manufacturer: STM

Erzincan Ergan 2 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 2392 m · Carrying capacity/hour: 1200
Manufacturer: STM

Covetan (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1496 m · Carrying capacity/hour: 2600
Manufacturer: Leitner
Ski resort: Les Saisies (Espace Diamant)
Replacement lift: 2pers. Chairlift (fixed-grip)

3 Coins (YOC 2011)

J-bar
Length: 500 m · Carrying capacity/hour: 720
Ski resort: Praz sur Arly (Espace Diamant)

Monte Conca (YOC 2011)

J-bar
Length: 1341 m · Carrying capacity/hour: 800
Manufacturer: Leitner
Replacement lift: J-bar

Grafenmatt-Zeiger (YOC 2011)

Rope tow/ beginner lift
Length: 30 m · Carrying capacity/hour: 300
Ski resort: Grafenmatt (Liftverbund Feldberg)

Polar Peak Lift (YOC 2011)

3pers. Chairlift (fixed-grip)
Length: 648 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

Reckmoos Nord (YOC 2011)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1860 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Folgaria-Sommo Alto (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400

Fox Peak Platter (YOC 2011)

J-bar
Length: 700 m · Carrying capacity/hour: 720

Lift 6 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1156 m · Carrying capacity/hour: 2220
Manufacturer: Doppelmayr

Lift 5 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 550 m · Carrying capacity/hour: 2024
Manufacturer: Doppelmayr

Schillingbahn (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2045 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Ski resort: Jochtal
Replacement lift: J-bar , J-bar

Gaisjochbahn (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1960 m · Carrying capacity/hour: 800
Manufacturer: Leitner
Ski resort: Gitschberg

Cairnwell Cafe (YOC 2011)

2pers. Chairlift (fixed-grip)

Übungslift Halsmarter 2 (YOC 2011)

Rope tow/ beginner lift
Length: 200 m · Carrying capacity/hour: 700
Manufacturer: SunKid

Grächen-Hannigalp (Märchengondelbahn) (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2323 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Peretol (YOC 2011)

J-bar
Length: 258 m · Carrying capacity/hour: 850
Manufacturer: Doppelmayr
Ski resort: Grau Roig (Grandvalira)

Montmalús (YOC 2011)

J-bar
Length: 922 m · Carrying capacity/hour: 880
Manufacturer: Doppelmayr
Ski resort: Grau Roig (Grandvalira)
Replacement lift: J-bar

Encampadana (YOC 2011)

J-bar
Length: 357 m · Carrying capacity/hour: 840
Manufacturer: Doppelmayr
Ski resort: El Tarter (Grandvalira)

Sasso Levante (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1128 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Ski resort: Wolkenstein (Gröden)
Replacement lift: 3pers. Chairlift (fixed-grip)

Funjet (YOC 2011)

T-bar
Length: 591 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

Good Aura (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2800 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Gudauri Baby Skilift (YOC 2011)

J-bar
Length: 600 m · Carrying capacity/hour: 720
Manufacturer: Poma

Gulmarg Chair Lift Mid Station (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1200 m · Carrying capacity/hour: 1200
Manufacturer: Poma

Alm 6er (YOC 2011)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1492 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Bürglalmbahn (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1736 m · Carrying capacity/hour: 1980
Manufacturer: Doppelmayr
Ski resort: Dienten (Hochkönig)
Replacement lift: T-bar

Snow Pine Quad (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 640 m · Carrying capacity/hour: 1600
Replacement lift: 2pers. Chairlift (fixed-grip)

Hunter West Express (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1141 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip) , 2pers. Chairlift (fixed-grip)

Ost 6:An (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1101 m · Carrying capacity/hour: 3200
Manufacturer: Leitner
Replacement lift: 4pers. Chairlift (fixed-grip) , 3pers. Chairlift (fixed-grip)

Ostknappen (YOC 2011)

J-bar
Length: 670 m · Carrying capacity/hour: 800
Manufacturer: Leitner

Übungslift Hoch-Imst (YOC 2011)

Rope tow/ beginner lift
Length: 100 m · Carrying capacity/hour: 720
Manufacturer: SunKid

Kinderlift (YOC 2011)

Rope tow/ beginner lift
Length: 200 m · Carrying capacity/hour: 500
Manufacturer: SunKid

Sonnenbahn (YOC 2011)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 646 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Ischgl
Replacement lift: T-bar

Méné (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1168 m · Carrying capacity/hour: 1600
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)

Marmot Lift (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 1000

Bräma Jet (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1501 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Ski resort: Jakobshorn (Davos)
Replacement lift: T-bar

Paradise Express (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1450 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)

School House (YOC 2011)

3pers. Chairlift (fixed-grip)
Length: 380 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: T-bar

Gastlosenexpress (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1624 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Jina (YOC 2011)

T-bar
Length: 390 m · Carrying capacity/hour: 890
Manufacturer: Leitner

KL Lift M (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1195 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Biały Jar (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 579 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Cankiri Ilgaz (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 1539 m · Carrying capacity/hour: 1200
Manufacturer: STM

SilverJet 2 (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2250 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Öksüzler Yurdu (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2419 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Sağ Sakallık (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 2127 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Üstistosyon (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1802 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Yalҫin (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 883 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

Sirt (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1365 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

Karakulak Tepe (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1553 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Telegraf (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 500 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF
Replacement lift: T-bar

Resterhöhe (YOC 2011)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1510 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Ski resort: Kitzbühel-Kirchberg-Jochberg-Pass Thurn
Replacement lift: 2pers. Chairlift (fixed-grip)

CineStar Express (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 1235 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Riedkopf (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 717 m · Carrying capacity/hour: 1974
Manufacturer: Doppelmayr
Replacement lift: T-bar

Katrina (YOC 2011)

J-bar
Length: 341 m · Carrying capacity/hour: 780
Manufacturer: Leitner
Ski resort: Klövsjö (Vemdalen)

Czorsztyn A (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 600 m · Carrying capacity/hour: 2000
Manufacturer: Tatrapoma

Pungart (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1004 m · Carrying capacity/hour: 1824
Manufacturer: Leitner
Replacement lift: T-bar

Percha-Ried (YOC 2011)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 4340 m · Carrying capacity/hour: 3200
Manufacturer: Leitner
Ski resort: Bruneck (Kronplatz)

Col Toron (YOC 2011)

9pers. Gondola lift (monocable circulating ropeway)
Length: 1369 m · Carrying capacity/hour: 2600
Manufacturer: Leitner
Ski resort: St. Vigil (Kronplatz)
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway)

Miara (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1711 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: St. Vigil (Kronplatz)
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway)

Vologne Express (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 632 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 3pers. Chairlift (fixed-grip)

Pic (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 1142 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 4pers. Chairlift (fixed-grip)

Fabres (YOC 2011)

3pers. Chairlift (fixed-grip)
Length: 1655 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr

Verdons Sud (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1814 m · Carrying capacity/hour: 3600
Manufacturer: Poma
Replacement lift: 4pers. Chairlift (fixed-grip)

Alp Dado-Crest la Siala (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1576 m · Carrying capacity/hour: 3200
Manufacturer: Leitner
Replacement lift: T-bar

Pourteilh (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1415 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Desert Blanc (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Flaine (Grand Massif)

Le Transit (YOC 2011)

24pers. Pulsed-movement aerial ropeway (gondola)
Length: 263 m · Carrying capacity/hour: 635
Manufacturer: Doppelmayr

Télésiège des Longes (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 900 m · Carrying capacity/hour: 1800
Replacement lift: J-bar , J-bar

Weibermahdbahn (YOC 2011)

Combined installation (8 pers. chair and 10 pers. gondola) with seat heating
Length: 771 m · Carrying capacity/hour: 3874
Manufacturer: Doppelmayr
Ski resort: Lech am Arlberg (Lech-Zürs)
Replacement lift: 4pers. Chairlift (fixed-grip)

Mont Blanc (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1547 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF
Replacement lift: 3pers. Chairlift (fixed-grip) , J-bar

Dome Nord (YOC 2011)

T-bar
Length: 992 m · Carrying capacity/hour: 1170
Manufacturer: Doppelmayr
Replacement lift: T-bar

Les Crêtes (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1400 m · Carrying capacity/hour: 2000
Manufacturer: Poma
Replacement lift: J-bar , J-bar

La Ravine (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 703 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Rochassons (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 836 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Châtel (Les Portes du Soleil)
Replacement lift: 2pers. Chairlift (fixed-grip)

Grande-Conche (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1479 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Champéry (Les Portes du Soleil)
Replacement lift: 2pers. Chairlift (fixed-grip) , J-bar

Mayentzet-Les Ruinettes (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1480 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Verbier (Les Quatre Vallées)
Replacement lift: 2pers. Chairlift (fixed-grip) , 2pers. Chairlift (fixed-grip)

De Thorens (YOC 2011)

33pers. Funitel - wind stable gondola lift with two parallel haul ropes at a distance
Length: 780 m · Carrying capacity/hour: 1500
Manufacturer: Bartholet BMF
Ski resort: Val Thorens (Les Trois Vallées)

Saulire Express 2 (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1948 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Méribel (Les Trois Vallées)

Plantrey (YOC 2011)

6pers. High speed chairlift (detachable)
Length: 1735 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Courchevel (Les Trois Vallées)
Replacement lift: 4pers. High speed chairlift (detachable)

Kinderlift Wintersport Arena (YOC 2011)

Rope tow/ beginner lift
Length: 150 m · Carrying capacity/hour: 600

Botarèl-Tea Dal Plan (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 802 m · Carrying capacity/hour: 2700
Manufacturer: Doppelmayr

Almbahn I (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1900 m · Carrying capacity/hour: 1610
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Chair 4 (YOC 2011)

3pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 1500
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Pinzolo-Campiglio Express III (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1151 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Ski resort: Pinzolo

Pinzolo-Campiglio Express II (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2353 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Ski resort: Pinzolo

Pinzolo-Campiglio Express I (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1223 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Ski resort: Pinzolo

Boch Express (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 665 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Madonna di Campiglio
Replacement lift: 3pers. Chairlift (fixed-grip)

Dos de la Pesa (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1236 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Folgàrida-Marilléva
Replacement lift: 2pers. Chairlift (fixed-grip)

High-Five Express (Chair 5) (YOC 2011)

4pers. High speed chairlift (detachable)
Length: 880 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)

Lift 5 (YOC 2011)

3pers. Chairlift (fixed-grip)
Length: 716 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr

Tatra Poma I (YOC 2011)

J-bar
Length: 515 m · Carrying capacity/hour: 700
Manufacturer: Poma
Replacement lift: J-bar

Sonnenbahn-Speiereck (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2238 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
Test Reports
Highlights
Slope preparation
Beginners
Highlights
Advanced skiers, freeriders
Après-ski
Ski Special • Tips for the ski holiday
Events
Hochzillertal
2013-11-30
Kitzbuehel
2014-01-24 – 2014-01-26
Lifts and Cable Cars
Fuegen/Spieljoch
Spectacular World Cup races on the famous Saslong slope, romantic sunsets on Col Raiser, or the legendary Sella Ronda ski tour. The winter in Val Gardena shows the Dolomites at their best. more...
Test Reports
Highlights
Slope offering, run variety
Slope preparation
Highlights
Advanced skiers, freeriders
Slope offering, run variety
The family-friendly Wildkogel Ski Arena in the heart of the Alps offers skiers, from rookie to pro, 55 km of superbly groomed slopes. Thanks to modern snowmaking equipment skiing is guaranteed until springtime. more...