Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Select country/region »
Select region
Select country/region »

New lifts and cable cars Worldwide (319)
Season 2003/2004

FIL NEIGE DE LARCHE (YOC 2003)

Rope tow/beginner lift
Length: 90 m · Carrying capacity/hour: 600
Manufacturer: Schippers

Nob (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1539 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

Malga Laghetto-Ust (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 800 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Sonnek-Ust (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 414 m · Carrying capacity/hour: 1800

Caoubere (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1446 m · Carrying capacity/hour: 2600
Manufacturer: Poma

TSD le Maroly (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1400 m · Carrying capacity/hour: 2245
Manufacturer: Poma

TK Télécorde Junior (YOC 2003)

Rope tow/beginner lift
Length: 145 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Grand Massif Express (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2945 m · Carrying capacity/hour: 2500
Manufacturer: Poma
Ski resort: Le Grand Massif (Samoens)

Damoiseaux (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 423 m · Carrying capacity/hour: 2280
Manufacturer: Poma
Ski resort: Le Grand Massif (Samoens)

Babuches (YOC 2003)

J-bar
Length: 290 m · Carrying capacity/hour: 900
Manufacturer: Poma
Ski resort: Le Grand Massif (Samoens)

Pendant 2 (YOC 2003)

J-bar
Length: 212 m · Carrying capacity/hour: 900
Manufacturer: Poma
Ski resort: Le Grand Massif (Samoens)

Pendant 1 (YOC 2003)

J-bar
Length: 212 m · Carrying capacity/hour: 900
Manufacturer: Poma
Ski resort: Le Grand Massif (Samoens)

PUY DU ROCHER (YOC 2003)

J-bar
Length: 1147 m · Carrying capacity/hour: 700
Manufacturer: Montaz

Steinmähderbahn (YOC 2003)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1328 m · Carrying capacity/hour: 4000
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Lech am Arlberg)
Replacement lift: 4pers. High speed chairlift (detachable)

Jägeralp-Express (YOC 2003)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1466 m · Carrying capacity/hour: 2360
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Warth)
Replacement lift: 2pers. Chairlift (fixed-grip)

Saloberjet (YOC 2003)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1192 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Schröcken)
Replacement lift: 4pers. Chairlift (fixed-grip)

Sonnenjet Auenfeld (YOC 2003)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1454 m · Carrying capacity/hour: 2900
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Schröcken)
Replacement lift: 2pers. Chairlift (fixed-grip)

Hasensprung (YOC 2003)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 847 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Lech am Arlberg)
Replacement lift: 2pers. Chairlift (fixed-grip)

Trittalpbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 920 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Ski resort: Lech-Zürs-Warth-Schröcken (Zürs am Arlberg)
Replacement lift: 4pers. Chairlift (fixed-grip)

Sonnencruiser-Auenfeld (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1108 m · Carrying capacity/hour: 1900
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Schröcken)

Hochalpbahn (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 770 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Schröcken)
Replacement lift: T-bar

Schafalplift (YOC 2003)

J-bar
Length: 666 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
Ski resort: Lech-Zürs-Warth-Schröcken (Lech am Arlberg)

L'ECUREUIL (YOC 2003)

J-bar
Length: 342 m · Carrying capacity/hour: 847
Manufacturer: Doppelmayr

PLA DEL MIR (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1240 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

COULLADE (YOC 2003)

J-bar
Length: 177 m · Carrying capacity/hour: 797
Manufacturer: Doppelmayr

Vanoise Express (YOC 2003)

200pers. Two-storey aerial tramway/ reversible ropeway
Length: 1830 m · Carrying capacity/hour: 1000
Manufacturer: Poma

Le Cabriolet (YOC 2003)

16pers. Pulsed-movement aerial ropeway (gondola)
Length: 239 m · Carrying capacity/hour: 800
Manufacturer: Poma

Bois de l'Ours (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1032 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Marmottes (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 881 m · Carrying capacity/hour: 3000
Manufacturer: Garaventa

Toura (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1096 m · Carrying capacity/hour: 2400
Manufacturer: Poma

ARPONS (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1453 m · Carrying capacity/hour: 2000
Manufacturer: Montaz

Des Arpons (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1453 m · Carrying capacity/hour: 2000
Manufacturer: GMM

TSD des Perrières (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1685 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Les Portes du Soleil (Les Gets-Sagets)

Chavannes (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 2425 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Les Portes du Soleil (Les Gets-Sagets)

La Charniaz (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1684 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Les Portes du Soleil (Morzine)

TSD de Zore (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 1299 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Avoriaz (Les Portes du Soleil)

Contrebandiers (YOC 2003)

J-bar
Length: 342 m · Carrying capacity/hour: 900
Manufacturer: Poma
Ski resort: Les Portes du Soleil (Châtel)

Bossons (YOC 2003)

J-bar
Length: 842 m · Carrying capacity/hour: 820
Manufacturer: Poma
Ski resort: Les Portes du Soleil (Châtel)

EAU D'OLLE (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 2058 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
Ski resort: Les Sybelles (St. Sorlin d'Arves)

NIEBLAIS (YOC 2003)

J-bar
Length: 873 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (Le Corbier)

TORRET 1 (YOC 2003)

J-bar
Length: 1295 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (Le Corbier)

L'OUILLON (YOC 2003)

J-bar
Length: 937 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (La Toussuire)

CHAMOIS (YOC 2003)

J-bar
Length: 551 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (La Toussuire)

PLAN DE LA COMBE (YOC 2003)

J-bar
Length: 330 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (La Toussuire)

TELEBABY (YOC 2003)

J-bar
Length: 91 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Ski resort: Les Sybelles (Le Corbier)

La Becca (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1596 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Ski resort: Les Trois Vallées (Les Menuires)

La Becca (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1596 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Ski resort: Les Trois Vallées (Les Menuires)

Des Gravelles (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 891 m · Carrying capacity/hour: 1790
Manufacturer: Skirail
Ski resort: Les Trois Vallées (Courchevel)

Daubensee (YOC 2003)

8pers. Aerial tramway/Reversible ropeway
Length: 575 m · Carrying capacity/hour: 90
Manufacturer: Niederberger
Replacement lift: 2pers. Chairlift (fixed-grip)

Sammu (Nr. 7B) (YOC 2003)

T-bar
Length: 1297 m · Carrying capacity/hour: 1252
Manufacturer: Doppelmayr

Utsun (YOC 2003)

J-bar
Length: 257 m · Carrying capacity/hour: 795
Manufacturer: Doppelmayr

Faschingalm (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1950 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Carosello (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 282 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Val Federia Salin (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1179 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gandegg-Hockenhorngrat (YOC 2003)

15pers. Gondola lift (monocable circulating ropeway)
Length: 970 m · Carrying capacity/hour: 1200
Manufacturer: Garaventa

Logojsk (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 632 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Columbia Chair (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 193 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Timber Wolf (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 700 m · Carrying capacity/hour: 1200
Manufacturer: Riblet

BEDERET EXPRESS (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1494 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Nagy-Mihály (YOC 2003)

T-bar
Length: 650 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Súgó-Baby-1 (YOC 2003)

Rope tow/beginner lift
Length: 160 m · Carrying capacity/hour: 600

Orso Bruno (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1473 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Ski resort: Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Folgàrida-Marilléva)
Replacement lift: 3pers. Chairlift (fixed-grip)

Genziana Express (YOC 2003)

4pers. High speed chairlift (detachable) with bubble
Length: 1600 m · Carrying capacity/hour: 2070
Manufacturer: Doppelmayr
Ski resort: Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Madonna di Campiglio)

Colibri Expertos (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 216 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Madrid Xanadu 2 (YOC 2003)

J-bar
Length: 75 m · Carrying capacity/hour: 720
Manufacturer: Poma

Madrid Xanadu 1 (YOC 2003)

J-bar
Length: 220 m · Carrying capacity/hour: 720
Manufacturer: Poma

Bannoe (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1650 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr

Chill Factore 1 (YOC 2003)

J-bar
Length: 180 m · Carrying capacity/hour: 500
Manufacturer: Poma

Chill Factore 2 (YOC 2003)

J-bar
Length: 180 m · Carrying capacity/hour: 500
Manufacturer: Poma

Manzaneda (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1555 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)

Stolp (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 945 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Lift 6 (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 722 m · Carrying capacity/hour: 2000
Manufacturer: Partek

Finkenberg 2 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 860 m · Carrying capacity/hour: 2880
Manufacturer: Doppelmayr
Ski resort: Mayrhofen/Penken-Ahorn-Rastkogel-Eggalm (Finkenberg/Penken)
Replacement lift: 2pers. Chairlift (fixed-grip)

Tappenalm (YOC 2003)

8pers. High speed chairlift (detachable)
Length: 614 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Ski resort: Mayrhofen/Penken-Ahorn-Rastkogel-Eggalm (Mayrhofen/Penken)
Replacement lift: 2pers. Chairlift (fixed-grip)

Knorren (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1037 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Mayrhofen/Penken-Ahorn-Rastkogel-Eggalm (Mayrhofen/Penken)
Replacement lift: 2pers. Chairlift (fixed-grip)

TSD de la Croix (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 967 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Hochserles (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1975 m · Carrying capacity/hour: 900
Manufacturer: Leitner
Replacement lift: 1pers. Chairlift (fixed-grip)

Żar (YOC 2003)

110pers. Funicular
Length: 1300 m · Carrying capacity/hour: 1100
Manufacturer: Von Roll

Bodenbauerexpress (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 2191 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr

Gemeindealpe-Gipfelbahn (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 979 m · Carrying capacity/hour: 1006
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)

Grabnerlift (YOC 2003)

J-bar
Length: 182 m · Carrying capacity/hour: 650
Manufacturer: Doppelmayr

L'Hybride (YOC 2003)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1568 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Monti del Sole (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 875 m · Carrying capacity/hour: 765
Manufacturer: Leitner

New Ssang Ssang (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 769 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr

Übungslift (YOC 2003)

Rope tow/beginner lift
Length: 100 m · Carrying capacity/hour: 500
Manufacturer: Multi Lift

Zwerenalpbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 222 m · Carrying capacity/hour: 2366
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)

Zehnerkarbahn (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1707 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 45pers. Aerial tramway/Reversible ropeway

Kringsalmbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1077 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Replacement lift: T-bar , T-bar

Achenrain (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 826 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Gamsleiten 2 (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 930 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr

Grünberglift (YOC 2003)

T-bar
Length: 289 m · Carrying capacity/hour: 900
Manufacturer: Doppelmayr

Brunnenkopfbahn (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 658 m · Carrying capacity/hour: 2320
Manufacturer: Doppelmayr
Replacement lift: T-bar

Coleman Brook Express Quad (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 771 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Telemix de Rocherousse (YOC 2003)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2400 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Hyttliheisen (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 931 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Le Fosse - Monte Arso (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1276 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr

El Cortal (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 437 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Champagne Express (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 1995 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip) , T-bar

Summit Quad (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 891 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: T-bar

Turbulence (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 639 m · Carrying capacity/hour: 1500
Manufacturer: Partek

Hnědý vrch (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1170 m · Carrying capacity/hour: 1460
Manufacturer: Doppelmayr
Replacement lift: T-bar

Vysoký svah (YOC 2003)

T-bar
Length: 780 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Busa Stavelin- Doss dei Cembri (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 325 m · Carrying capacity/hour: 1320
Manufacturer: Graffer

Village Eight Express (YOC 2003)

8pers. High speed chairlift (detachable)
Length: 548 m · Carrying capacity/hour: 4000
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

New Hawk (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 627 m · Carrying capacity/hour: 3100
Manufacturer: Doppelmayr

Pic de Piau (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 2049 m · Carrying capacity/hour: 2500
Manufacturer: Poma

Beginner Lift (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 250 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

La Bofià (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1140 m · Carrying capacity/hour: 1800
Manufacturer: Poma

Loma de Dilar (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 360 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Veleta 2 (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 1252 m · Carrying capacity/hour: 1600

L'Ancolie (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1530 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

COUGOURLES 2 (YOC 2003)

J-bar
Length: 522 m · Carrying capacity/hour: 600
Manufacturer: Montaz

Prati di Tivo-Fonte Cristiana (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 453 m · Carrying capacity/hour: 2185
Manufacturer: Leitner

Pilone di Mezzo Corno Piccolo (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 955 m · Carrying capacity/hour: 1198
Manufacturer: Leitner

MONTSERRAT (YOC 2003)

J-bar
Length: 910 m · Carrying capacity/hour: 900
Manufacturer: Poma

PAS DEL LLADRES (YOC 2003)

Rope tow/beginner lift
Length: 181 m · Carrying capacity/hour: 1450
Manufacturer: Poma

Hunerkogel (YOC 2003)

T-bar
Length: 347 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr

Austriascharten (YOC 2003)

J-bar
Length: 287 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr

Razula (YOC 2003)

T-bar
Length: 809 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr

Beginner Lift (YOC 2003)

J-bar
Length: 194 m · Carrying capacity/hour: 770
Manufacturer: Doppelmayr

Planja (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Solklinten Express (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1358 m · Carrying capacity/hour: 2800
Manufacturer: Leitner

6er Sesselbahn Zehner (YOC 2003)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1441 m · Carrying capacity/hour: 2412
Manufacturer: Doppelmayr
Ski resort: Saalbach Hinterglemm Leogang/Skicircus (Saalbach-Hinterglemm)
Replacement lift: T-bar

Asitzmuldenbahn (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 573 m · Carrying capacity/hour: 2455
Manufacturer: Doppelmayr
Ski resort: Saalbach Hinterglemm Leogang/Skicircus (Leogang)
Replacement lift: T-bar

GLACIER (YOC 2003)

J-bar
Length: 1714 m · Carrying capacity/hour: 652
Manufacturer: Doppelmayr

Naluns (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1460 m · Carrying capacity/hour: 3200
Manufacturer: Leitner
Replacement lift: T-bar , T-bar

Schönjochbahn Sek. 2 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1340 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Ski resort: Fiss
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Schönjochbahn Sek. 1 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1620 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Ski resort: Fiss
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Lawensbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1533 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Serfaus
Replacement lift: T-bar

Bletonet (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1623 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Hochjoch Bahn 1 (YOC 2003)

54pers. Aerial tramway/Reversible ropeway
Length: 1617 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Ski resort: Silvretta Montafon (Hochjoch)
Replacement lift: 45pers. Aerial tramway/Reversible ropeway

Hochjoch Bahn 2 (YOC 2003)

54pers. Aerial tramway/Reversible ropeway
Length: 1617 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
Ski resort: Silvretta Montafon (Hochjoch)
Replacement lift: 45pers. Aerial tramway/Reversible ropeway

Zamang Bahn (YOC 2003)

6pers. Gondola lift (monocable circulating ropeway)
Length: 2792 m · Carrying capacity/hour: 1850
Manufacturer: Doppelmayr
Ski resort: Silvretta Montafon (Hochjoch)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Sjusjøen Express (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1016 m · Carrying capacity/hour: 3200
Manufacturer: Leitner

Sjusjoen I (YOC 2003)

T-bar
Length: 300 m · Carrying capacity/hour: 1000
Manufacturer: Leitner

Sjusjoen II (YOC 2003)

J-bar
Length: 250 m · Carrying capacity/hour: 700
Manufacturer: Leitner

Skiward (YOC 2003)

3pers. Chairlift (fixed-grip)
Length: 337 m · Carrying capacity/hour: 1425
Manufacturer: Partek

Schneeberg (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 525 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Ski resort: SkiWelt Wilder Kaiser-Brixental (Westendorf)
Replacement lift: T-bar

Campground (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 1900 m · Carrying capacity/hour: 1000
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)

SnowWorld Funpark (YOC 2003)

J-bar
Length: 234 m · Carrying capacity/hour: 611
Manufacturer: Doppelmayr

Schwarze Schneid Bahn 2 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1013 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr

Schwarze Schneid Bahn 1 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 920 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr

Arlenmähderbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1629 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Ski resort: St. Anton am Arlberg-St. Christoph-Stuben (St. Anton am Arlberg)
Replacement lift: T-bar

Gampbergbahn (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1137 m · Carrying capacity/hour: 2211
Manufacturer: Leitner
Ski resort: St. Anton am Arlberg-St. Christoph-Stuben (St. Anton am Arlberg)
Replacement lift: T-bar

Hauereckjet (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 1200 m · Carrying capacity/hour: 1746
Manufacturer: Doppelmayr

Stock (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 1487 m · Carrying capacity/hour: 1500
Manufacturer: Leitner
Replacement lift: J-bar

Schaufeljochbahn (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1177 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Sulden-Schaubachhütte I (YOC 2003)

110pers. Aerial tramway/Reversible ropeway
Length: 1441 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr
Replacement lift: 50pers. Aerial tramway/Reversible ropeway

Sulden-Schaubachhütte II (YOC 2003)

110pers. Aerial tramway/Reversible ropeway
Length: 1441 m · Carrying capacity/hour: 1300
Manufacturer: Doppelmayr
Replacement lift: 50pers. Aerial tramway/Reversible ropeway

Standish Express (YOC 2003)

4pers. High speed chairlift (detachable)
Length: 870 m · Carrying capacity/hour: 1800
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)

Europa 8 (YOC 2003)

8pers. High speed chairlift (detachable)
Length: 1265 m · Carrying capacity/hour: 3800
Manufacturer: Doppelmayr
Ski resort: Tandådalen-Hundfjället (Hundfjället)
Replacement lift: 4pers. High speed chairlift (detachable)

Spicak I (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1184 m · Carrying capacity/hour: 2411
Manufacturer: Doppelmayr

Spicak II (YOC 2003)

T-bar
Length: 962 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Sunrise (YOC 2003)

2pers. Chairlift (fixed-grip)
Length: 612 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr

Alta Chair (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 450 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Alt St. Sohann-Sellamatt (YOC 2003)

Combined installation (4 pers. chair and 4 pers. gondola)
Length: 1490 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Oberdorf-Gamsalp (YOC 2003)

4pers. High speed chairlift (detachable) with bubble
Length: 2028 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa

Travnik 3 (YOC 2003)

T-bar
Length: 765 m · Carrying capacity/hour: 980
Manufacturer: Doppelmayr

Kanken (YOC 2003)

J-bar
Length: 671 m · Carrying capacity/hour: 900
Manufacturer: Poma

La Ramasse (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 2324 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Croix du Sapet (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 573 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Salegares (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 284 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

De la Brive 2 (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 1626 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Valmeinier-Valloire/Galibier Thabor (Valloire)

Pre Aynard (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 504 m · Carrying capacity/hour: 1800
Manufacturer: Poma
Ski resort: Valmeinier-Valloire/Galibier Thabor (Valmeinier)

Lac de la Vieile (YOC 2003)

4pers. Chairlift (fixed-grip)
Length: 1009 m · Carrying capacity/hour: 1800
Manufacturer: Poma
Ski resort: Valmeinier-Valloire/Galibier Thabor (Valloire)
Test Reports
Highlights
Ski resort size
Snow parks
Ski Special • Tips for the ski holiday
Photos
Events
Kitzbuehel
2015-01-23 – 2015-01-25
Lifts and Cable Cars
Arosa-Lenzerheide
Live Webcam
Flachau-Wagrain-Alpendorf
The new G-Link connects the Wagrain ski resorts and Alpendorf opened two brand new chair lifts with bubbles. You can now ski from Flachau to Alpendorf without interruption. more...
Trail Maps
Test Reports
Highlights
Families and children
Slope offering, run variety
Highlights
Friendliness of staff
Mountain restaurants, ski huts, gastronomy
The new dream team of Switzerland
Make way! The connecting railway between Arosa and Lenzerheide is in operation! Guests can travel from one side to the other in only 3 minutes. more...