Change lift info:

Norway: new lifts 2009/2010

All new lifts in Norway (Norge) for the 2009/2010 - season - new lifts at ski resorts in Norway (Norge) : renewal of ski lifts or ski resort expansions in Norway (Norge)


Overview: new ski lifts in Norway (Norge) 2009/2010

Total: 7
2
5

Add lifts and cable cars? Please report here



Map: new lift in Norway (Norge)

Show map
Norway – limit to

Norway – switch to

Norway: new ski lifts 2009/2010

1-6 out of 6 ski resorts

Stromyra II (YOC 2009)

T-bar
Length: 1011 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: J-bar

Fryvill (YOC 2009)

J-bar
Length: 308 m · Carrying capacity/hour: 811
Manufacturer: Doppelmayr
All lifts

Moseterheisen (YOC 2009)

J-bar
Length: 497 m · Carrying capacity/hour: 730
Manufacturer: Doppelmayr
All lifts

Fyriegg Expressen (YOC 2009)

4pers. High speed chairlift (detachable)
Length: 1415 m · Carrying capacity/hour: 1620
Manufacturer: Leitner
All lifts

Fursetheisa (YOC 2009)

4pers. High speed chairlift (detachable)
Length: 1132 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
All lifts

Nedre Bøseterheis (YOC 2009)

J-bar
Length: 715 m · Carrying capacity/hour: 896
Manufacturer: Leitner
All lifts

Childrenlift Utviksfjellet (YOC 2009)

J-bar
Length: 235 m · Carrying capacity/hour: 795
Manufacturer: Leitner
Ski resort
1-6 out of 6 ski resorts