Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » North America » United States
Change region
Worldwide » North America » United States

New Alpine Lift 1 (YOC 2013)

3pers. Chairlift (fixed-grip)
Length: 1250 m · Carrying capacity/hour: 1200
Manufacturer: Skytrac Inc.
Replacement lift: 2pers. Chairlift (fixed-grip)

New Alpine Lift 2 (YOC 2013)

3pers. Chairlift (fixed-grip)
Length: 1200 m · Carrying capacity/hour: 1200
Manufacturer: Skytrac Inc.

planned: Peak 6 Express (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2000

planned: Peak 6 (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 1800

Chair 6 (YOC 2013)

4pers. High speed chairlift (detachable) with bubble
Length: 1308 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 4pers. High speed chairlift (detachable) with bubble

Hunt Hollow Double (YOC 2013)

2pers. Chairlift (fixed-grip)
Length: 900 m · Carrying capacity/hour: 1200

planned: Chairlift C (YOC 2013)

4pers. Chairlift (fixed-grip)

planned: La Valle T-Bar (YOC 2013)

T-bar
Length: 305 m · Carrying capacity/hour: 500

Cascade Basin (YOC 2013)

3pers. Chairlift (fixed-grip)
Length: 800 m · Carrying capacity/hour: 1500

North America > United States > Utah

Snowbird

planned: Gad 2 Express (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 1247 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Granite Chief Express (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 1890 m · Carrying capacity/hour: 2400
Replacement lift: 3pers. Chairlift (fixed-grip)

planned: Jupiter Express (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 1300 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. Chairlift (fixed-grip)

North America > United States > Maine

Sugarloaf

planned: Double Runner (YOC 2013)

4pers. Chairlift (fixed-grip) Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip) , 2pers. Chairlift (fixed-grip)

planned: North Side Express (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 945 m · Carrying capacity/hour: 2000
Test Reports
Highlights
Ski resort size
Lifts and cable cars
Highlights
Families and children
Arrival, on-site parking
Ski Special • Tips for the ski holiday
Events
Kitzbuehel
2014-01-24 – 2014-01-26
Hochzillertal
2013-11-30
Lifts and Cable Cars
Ratschings-Jaufen
Live Webcam
Austria | Zillertal Arena
The t-bar Kreuzwiesen in Zell am Ziller will be replaced by a new state of the art 6-person chair lift with covers in December 2012. more...
Test Reports
Highlights
Beginners
Families and children
Highlights
Slope offering, run variety
Slope preparation
Germany-Austria | Reit im Winkl/Winklmoosalm-Steinplatte
The modern high speed six-person-chair with covers, seat heating and child-proof lock replaced the oly Scheibelberg t-bar. Now you can reach the Steinplatte from the Winklmoosalm very easy. more...