Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

British Columbia: new lifts 2008/2009

All new lifts in British Columbia for the 2008/2009 - season - new lifts at ski resorts in British Columbia : renewal of ski lifts or ski resort expansions in British Columbia


Overview: new ski lifts in British Columbia 2008/2009

Total: 5
2
3

Add lifts and cable cars? Please report here



British Columbia - expand to (number of new lifts):

Map: new lift in British Columbia

British Columbia - limit to (number of new lifts):

British Columbia: new ski lifts 2008/2009

1-3 out of 3 ski resorts

Peak 2 Peak (Bj. 2008)

28pers. Tricable ropeway
Length: 4407 m · Carrying capacity/hour: 4100
Manufacturer: Doppelmayr
All lifts

Revelation I (Bj. 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1025 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

The Ripper (Bj. 2008)

4pers. High speed chairlift (detachable)
Length: 1880 m · Carrying capacity/hour: 1800
Manufacturer: Leitner-Poma
All lifts

Greenway Chair (Bj. 2008)

4pers. Chairlift (fixed-grip)
Length: 203 m · Carrying capacity/hour: 1200
Manufacturer: Poma

Peak Chair (Bj. 2008)

4pers. Chairlift (fixed-grip)
Length: 550 m · Carrying capacity/hour: 1500
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts
    1-3 out of 3 ski resorts