Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

Russia Russia: new lifts 2009/2010

All new lifts in Russia for the 2009/2010 - season - new lifts at ski resorts in Russia : renewal of ski lifts or ski resort expansions in Russia


Overview: new ski lifts in Russia 2009/2010

Total: 6
3
3

Add lifts and cable cars? Please report here



Russia - expand to (number of new lifts):

Map: new lift in Russia

Russia - limit to (number of new lifts):

Russia Russia: new ski lifts 2009/2010

1-4 out of 4 ski resorts

Starý Krugozor-Mir (Elbrus 2) (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1802 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

Gornaya Karusel K1 (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Gornaya Karusel K2 (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Gornaya Karusel K8 (YOC 2009)

4pers. Chairlift (fixed-grip)
Length: 1013 m · Carrying capacity/hour: 1800
Manufacturer: Poma
All lifts

Shukolovo Chair (YOC 2009)

4pers. Chairlift (fixed-grip)
Length: 290 m · Carrying capacity/hour: 2000
All lifts

Tuimazy (YOC 2009)

4pers. Chairlift (fixed-grip)
Length: 367 m · Carrying capacity/hour: 1750
Manufacturer: Doppelmayr
Ski resort
    1-4 out of 4 ski resorts