Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

Province of Trento: new lifts 2010/2011

All new lifts in the Province of Trento for the 2010/2011 - season - new lifts at ski resorts in the Province of Trento : renewal of ski lifts or ski resort expansions in the Province of Trento


Overview: new ski lifts in the Province of Trento 2010/2011

Total: 9
1
1
5
2

Add lifts and cable cars? Please report here



Province of Trento - expand to (number of new lifts):

Map: new lift in the Province of Trento

Province of Trento - limit to (number of new lifts):

Province of Trento: new ski lifts 2010/2011

1-4 out of 4 ski resorts

Agnello (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 1124 m · Carrying capacity/hour: 2000
Manufacturer: Agamatic
Obereggen-Pampeago-Predazzo/Latemar (Pampeago)
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

Malga Piovernetta-Monte Pioverna (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 991 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Malga Piovernetta-Termental (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 823 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Val delle Lanze-Costa d'Agra (Bj. 2010)

4pers. High speed chairlift (detachable)
Length: 1760 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

Tulot-Malga Cioca (Bj. 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2453 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Pinzolo)

Grual-Monte Grual (Bj. 2010)

4pers. Chairlift (fixed-grip)
Length: 360 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Pinzolo)

Malghet Aut 2 (Bj. 2010)

J-bar
Length: 310 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Folgàrida-Marilléva)
Replacement lift: J-bar

Malghet Aut 1 (Bj. 2010)

J-bar
Length: 310 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
Madonna di Campiglio-Pinzolo-Folgàrida-Marilléva (Folgàrida-Marilléva)
Replacement lift: J-bar
All lifts

Pejo 3000 (Tarlenta-Rifugio Mantova) (Bj. 2010)

100pers. Funifor - wind stable ropeway with wide rope gauge
Length: 2856 m · Carrying capacity/hour: 860
Manufacturer: Doppelmayr
All lifts
    1-4 out of 4 ski resorts