Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe » Italy » Province of Trento
Change region
Worldwide » Europe » Italy » Province of Trento

New lifts and cable cars Province of Trento (8)
Season 2006/2007

Delle Baite (YOC 2006)

J-bar
Length: 463 m · Carrying capacity/hour: 720

Salei (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 749 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Europe > Italy > Province of Trento
Europe > Italy > Veneto

Folgaria-Fiorentini

Coston-Monte Coston (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 1680 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Europe > Italy > Province of Trento

Molveno/Pradel

Pradel-Croz dell'Altissimo (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 698 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Pala di Santa (YOC 2006)

4pers. High speed chairlift (detachable) with bubble
Length: 1120 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Ski resort: Obereggen-Pampeago-Predazzo/Latemar (Pampeago)

Obereggen (YOC 2006)

4pers. High speed chairlift (detachable)
Length: 572 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Obereggen-Pampeago-Predazzo/Latemar (Obereggen)
Replacement lift: 4pers. Chairlift (fixed-grip)

Colonia Vigili-Passo Tonale (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2413 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Ponte di Legno-Colonia Vigili (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2654 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
Test Reports
Highlights
Slope preparation
Lifts and cable cars
Highlights
Ski resort size
Mountain restaurants, ski huts, gastronomy
Ski Special • Tips for the ski holiday
Events
Silvretta Montafon
2014-12-04 – 2014-12-14
Kitzbuehel
2015-01-23 – 2015-01-25
Lifts and Cable Cars
Schoeneben
Live Webcam
Mühlbach - Dienten - Maria Alm - and return
The Königstour is a breath-taking ski tour extending between Mühlbach, Dienten and Maria Alm. On family friendly 32km of pistes with 6.700m of total altitude difference dreams come true. more...
Test Reports
Highlights
Slope preparation
Beginners
The new dream team of Switzerland
Make way! The connecting railway between Arosa and Lenzerheide is in operation! Guests can travel from one side to the other in only 3 minutes. more...