Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe » Germany
Change region
Worldwide » Europe » Germany

New lifts and cable cars Germany (13)
Season 2013/2014

planned: Westfalenhang I (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 650 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar

planned: Waldkopfbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

planned: Weiherkopfbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1100 m · Carrying capacity/hour: 2400
Replacement lift: T-bar

Kaffeehorst-Wurmberggipfel (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 960 m · Carrying capacity/hour: 1800

Hahnenklee-Bocksberg (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 2000
Manufacturer: Bartholet BMF

planned: Krautkaser (YOC 2013)

4pers. High speed chairlift (detachable) with bubble
Length: 990 m · Carrying capacity/hour: 1500
Manufacturer: Leitner
Replacement lift: T-bar

planned: Fröttmaninger Berg (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 250 m · Carrying capacity/hour: 1500

Osthangbahn (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 575 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar , T-bar

planned: Zubringerbahn (YOC 2013)

8pers. High speed chairlift (detachable)
Length: 750 m · Carrying capacity/hour: 3000
Replacement lift: T-bar , T-bar

planned: Wiedhagbahn (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1150 m · Carrying capacity/hour: 2400
Replacement lift: T-bar , T-bar

planned: Gunzesried Express (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2300 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip) , T-bar

planned: Gipfel Express (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Replacement lift: T-bar

planned: Osthangbahn (YOC 2013)

4pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: T-bar , T-bar
Test Reports
Highlights
Orientation (trail map, information boards, sign-postings)
Cross-country skiing and trails
Ski Special • Tips for the ski holiday
Video
Arber
Photos
Events
Hochzillertal
2013-11-30
Kitzbuehel
2014-01-24 – 2014-01-26
Lifts and Cable Cars
Arber
Live Webcam
Germany-Austria | Reit im Winkl/Winklmoosalm-Steinplatte
The modern high speed six-person-chair with covers, seat heating and child-proof lock replaced the oly Scheibelberg t-bar. Now you can reach the Steinplatte from the Winklmoosalm very easy. more...
Trail Maps
Test Reports
Highlights
Beginners
Families and children
Highlights
Families and children
Lifts and cable cars
Current Info
http://www.skiresort.info/ski-resort/arber/
With its 6 person gondola, two 6 person chair lifts, t-bar lifts, the ArBaer children's area with 4 people movers and dwarf garden, funpark, winter toboggan run with floodlights, ski rental and ski service - it is one of the most modern ski resorts in Germany more...