Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

southern French Alps: new lifts 2005/2006

All new lifts in the southern French Alps for the 2005/2006 - season - new lifts at ski resorts in the southern French Alps : renewal of ski lifts or ski resort expansions in the southern French Alps


Overview: new ski lifts in the southern French Alps 2005/2006

Total: 19
1
3
10
2
3

Add lifts and cable cars? Please report here



southern French Alps - expand to (number of new lifts):

Map: new lift in the southern French Alps

southern French Alps - limit to (number of new lifts):

southern French Alps: new ski lifts 2005/2006

1-12 out of 12 ski resorts

Clot Gauthier (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1244 m · Carrying capacity/hour: 2400
Manufacturer: Poma

La Fôret (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1504 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Grand Serre (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1023 m · Carrying capacity/hour: 2500
Manufacturer: Poma
All lifts

PEYREFOLLE (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1470 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
All lifts

Mercantour (YOC 2005)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1618 m · Carrying capacity/hour: 2312
Manufacturer: Poma

Les Marmottes (YOC 2005)

4pers. Chairlift (fixed-grip)
Length: 653 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

Télémix Fontettes (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2267 m · Carrying capacity/hour: 2216
Manufacturer: Poma
Replacement lift: 4pers. Chairlift (fixed-grip)
All lifts

Les Butières (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1699 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Dome (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1276 m · Carrying capacity/hour: 3000
Manufacturer: Poma
All lifts

Telemix Drouvet 2 (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1577 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

Les Prés (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1896 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
All lifts

EGUILLES (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1410 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

Fil-Neige ESF St. Jean (YOC 2005)

Rope tow/beginner lift
Length: 150 m · Carrying capacity/hour: 600
Manufacturer: Pelat Finet
All lifts

PRE GIRARDIN (YOC 2005)

6pers. High speed chairlift (detachable)
Length: 1344 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Melezet (YOC 2005)

J-bar
Length: 536 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr

Cascade (YOC 2005)

J-bar
Length: 279 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
All lifts

PALATIN (YOC 2005)

Rope tow/beginner lift
Length: 88 m · Carrying capacity/hour: 1500
Manufacturer: Poma
All lifts

Huskies (YOC 2005)

4pers. Chairlift (fixed-grip)
Length: 909 m · Carrying capacity/hour: 1500
Manufacturer: GMM Gimar Montaz Mautino
All lifts
    1-12 out of 12 ski resorts