Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

France France: new lifts 2015/2016

All new lifts in France for the 2015/2016 - season - new lifts at ski resorts in France : renewal of ski lifts or ski resort expansions in France


Overview: new ski lifts in France 2015/2016

Total: 19
1
1
16
1

Add lifts and cable cars? Please report here



France - expand to (number of new lifts):

Map: new lift in France

France - limit to (number of new lifts):

France France: new ski lifts 2015/2016

1-15 out of 15 ski resorts

Le Bettex (YOC 2015)

4pers. High speed chairlift (detachable)
Length: 1764 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Les 3 Vallées (Les Menuires)
Replacement lift: 2pers. Chairlift (fixed-grip)

St Martin Express (YOC 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 2404 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr
Ski resort: Les 3 Vallées (Saint Martin de Belleville)
Replacement lift: 4pers. High speed chairlift (detachable)

Combes (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1268 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Les 3 Vallées (Méribel)
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

planned: Méa (YOC 2015)

6pers. High speed chairlift (detachable)

Replacement lift: J-bar
J-bar
All lifts

Plagne-Montalbert (YOC 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2450 m · Carrying capacity/hour: 2800
Replacement lift: 4pers. High speed chairlift (detachable)
4pers. Chairlift (fixed-grip)
All lifts

Brocheaux (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 965 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Avoriaz (Les Portes du Soleil)
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

Dahu (YOC 2015)

15pers. Aerial tramway/Reversible ropeway
Length: 450 m · Carrying capacity/hour: 500
Manufacturer: Bartholet BMF
Replacement lift: 3pers. Chairlift (fixed-grip)

Carreley (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1875 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
All lifts

Tête de Cabeau (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 985 m · Carrying capacity/hour: 2000
Manufacturer: Poma
Replacement lift: J-bar
J-bar
All lifts

Haute Plane (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1300 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Replacement lift: J-bar
J-bar
All lifts

Les Bouleaux (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1169 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

Grand Jeux (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 1970 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 4pers. High speed chairlift (detachable)

Les Côtes (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 1300 m · Carrying capacity/hour: 1500
Manufacturer: Poma
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

Masseboeuf (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 510 m · Carrying capacity/hour: 2000
Manufacturer: GMM Gimar Montaz Mautino
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

planned: Cotch (YOC 2015)

6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
All lifts

Céciré (YOC 2015)

6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
Manufacturer: Poma
All lifts

Grand Haut (YOC 2015)

6pers. High speed chairlift (detachable)
Length: 949 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 3pers. Chairlift (fixed-grip)
All lifts

Lapadé (YOC 2015)

4pers. Chairlift (fixed-grip)
Length: 650 m · Carrying capacity/hour: 2000
Manufacturer: Poma
Replacement lift: Rope tow/beginner lift
All lifts

TKE du Stagnu (YOC 2015)

J-bar
Length: 498 m · Carrying capacity/hour: 720
Manufacturer: GMM Gimar Montaz Mautino
Replacement lift: J-bar
All lifts
    1-15 out of 15 ski resorts