Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

Vorarlberg: new lifts 2007/2008

All new lifts in Vorarlberg for the 2007/2008 - season - new lifts at ski resorts in Vorarlberg : renewal of ski lifts or ski resort expansions in Vorarlberg


Overview: new ski lifts in Vorarlberg 2007/2008

Total: 7
2
1
3
1

Add lifts and cable cars? Please report here



Vorarlberg - expand to (number of new lifts):

Map: new lift in Vorarlberg

Vorarlberg - limit to (number of new lifts):

Vorarlberg: new ski lifts 2007/2008

1-5 out of 5 ski resorts

Nasserein Kinderpark (Übungslift) (Bj. 2007)

J-bar
Length: 64 m · Carrying capacity/hour: 600
Manufacturer: Doppelmayr
St. Anton am Arlberg-St. Christoph-Stuben (St. Anton am Arlberg)
All lifts

Elsenkopf (Bj. 2007)

6pers. High speed chairlift (detachable) with bubble
Length: 750 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Damüls-Mellau (Damüls)

Hohe Wacht (Bj. 2007)

6pers. High speed chairlift (detachable)
Length: 1060 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Damüls-Mellau (Damüls)
All lifts

Panoramabahn Burtschasattel (Bj. 2007)

60pers. Aerial tramway/Reversible ropeway
Length: 1564 m · Carrying capacity/hour: 800
Manufacturer: Steurer

Dorfbahn Brand (Bj. 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1120 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

Heubergbahn (Bj. 2007)

4pers. High speed chairlift (detachable) with seat heating
Length: 800 m · Carrying capacity/hour: 1650
Manufacturer: Doppelmayr
All lifts

Seilbahn Schnifisberg (Bj. 2007)

5pers. Aerial tramway/Reversible ropeway
Length: 1730 m · Carrying capacity/hour: 30
Replacement lift: 5pers. Aerial tramway/Reversible ropeway
All lifts
    1-5 out of 5 ski resorts