Change lift info:

Vorarlberg: new lifts 2016/2017

All new lifts in Vorarlberg for the 2016/2017 - season - new lifts at ski resorts in Vorarlberg : renewal of ski lifts or ski resort expansions in Vorarlberg


Overview: new ski lifts in Vorarlberg 2016/2017

Total: 9
1
4
3
1

Add lifts and cable cars? Please report here



Vorarlberg - expand to (number of new lifts):

Map: new lift in Vorarlberg

Show map
Vorarlberg - limit to (number of new lifts):

Vorarlberg: new ski lifts 2016/2017

1-5 out of 5 ski resorts

planned: Flexenbahn (Verbindungsbahn Arlberg Ost und West) (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

planned: Albonabahn II (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2060 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Ski resort: St. Anton am Arlberg/St. Christoph/Stuben [Stuben]
Replacement lift: 2pers. Chairlift (fixed-grip)

Rauzlift (YOC 2016)

T-bar
Length: 164 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
Ski resort: St. Anton am Arlberg/St. Christoph/Stuben [Stuben]
Replacement lift: T-bar
All lifts

planned: Alptobelbahn (YOC 2016)

8pers. High speed chairlift (detachable) with bubble
Length: 2150 m · Carrying capacity/hour: 3000
Ski resort: Silvretta Montafon [Nova]
Replacement lift: 2pers. Chairlift (fixed-grip)
T-bar
All lifts

planned: Flexenbahn (Verbindungsbahn Arlberg Ost und West) (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

planned: Trittkopfbahn II (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 900 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Ski resort: Lech/Zürs/Warth/Schröcken [Zürs]

planned: Trittkopfbahn I (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1900 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Lech/Zürs/Warth/Schröcken [Zürs]
Replacement lift: 30pers. Aerial tramway/Reversible ropeway

Bergbahn Lech-Oberlech (YOC 2016)

80pers. Aerial tramway/Reversible ropeway
Length: 846 m · Carrying capacity/hour: 1200
Manufacturer: Steurer
Ski resort: Lech/Zürs/Warth/Schröcken [Lech]
Replacement lift: 28pers. Aerial tramway/Reversible ropeway
All lifts

Bierenwangbahn (YOC 2016)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 950 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: T-bar
All lifts

planned: Olympiabahn (YOC 2016)

6pers. High speed chairlift (detachable) with bubble and seat heating
Carrying capacity/hour: 2400
Replacement lift: T-bar
All lifts
1-5 out of 5 ski resorts