Select region
close
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Change lift info:

Salzburg (state): new lifts 2015/2016

All new lifts in the State of Salzburg for the 2015/2016 - season - new lifts at ski resorts in the State of Salzburg : renewal of ski lifts or ski resort expansions in the State of Salzburg


Overview: new ski lifts in the State of Salzburg 2015/2016

Total: 10
5
1
3
1

Add lifts and cable cars? Please report here



Salzburg (state) - expand to (number of new lifts):

Map: new lift in the State of Salzburg

Salzburg (state) - limit to (number of new lifts):

Salzburg (state): new ski lifts 2015/2016

1-7 out of 7 ski resorts

Brunn (Bj. 2015)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1460 m · Carrying capacity/hour: 3300
Manufacturer: Leitner
Kitzbühel-Kirchberg-Jochberg-Pass Thurn
All lifts

Mühlachalm (Bj. 2015)

T-bar
Carrying capacity/hour: 1200
Zillertal Arena (Königsleiten)
All lifts

TirolS (Verbindungsbahn Skicircus-Fieberbrunn) (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2600
Saalbach Hinterglemm Leogang Fieberbrunn/Skicircus (Saalbach-Hinterglemm)

Bernkogel 6er (Bj. 2015)

6pers. High speed chairlift (detachable) with bubble
Length: 1340 m · Carrying capacity/hour: 3000
Saalbach Hinterglemm Leogang Fieberbrunn/Skicircus (Saalbach-Hinterglemm)
Replacement lift: T-bar
T-bar
All lifts

planned: Schlossalmbahn (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3422 m · Carrying capacity/hour: 3000
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 120pers. Funicular

planned: Sendleitenbahn (Bj. 2015)

8pers. High speed chairlift (detachable)
Length: 1240 m · Carrying capacity/hour: 4000
Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 4pers. High speed chairlift (detachable)
All lifts

planned: Gletscherjet 4 (Bj. 2015)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1150 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Replacement lift: T-bar
T-bar

planned: Gletscherjet 3 (Bj. 2015)

Combined installation (8 pers. chair and 10 pers. gondola) with seat heating
Length: 1010 m · Carrying capacity/hour: 3600
Manufacturer: Doppelmayr
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
T-bar
All lifts

planned: Bischlinghöhe (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)

All lifts

planned: Kaprun Süd (Bj. 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2000
Replacement lift: 27pers. Aerial tramway/Reversible ropeway
All lifts
    1-7 out of 7 ski resorts