Change lift info:

Caucasus Mountains: new lifts 2013/2014

All new lifts in the Caucasus Mountains for the 2013/2014 - season - new lifts at ski resorts in the Caucasus Mountains : renewal of ski lifts or ski resort expansions in the Caucasus Mountains


Overview: new ski lifts in the Caucasus Mountains 2013/2014

Total: 29
11
2
13
3

Add lifts and cable cars? Please report here



Map: new lift in the Caucasus Mountains

Show map
Caucasus Mountains – limit to

Caucasus Mountains – switch to

Caucasus Mountains: new ski lifts 2013/2014

1-7 out of 7 ski resorts

Mzymta-Olympic Village (YOC 2013)

30pers. Tricable ropeway
Length: 1736 m · Carrying capacity/hour: 4500
Manufacturer: Doppelmayr

Olympic Village-Finish Zone (YOC 2013)

30pers. Tricable ropeway
Length: 1460 m · Carrying capacity/hour: 4500
Manufacturer: Doppelmayr

Strela (Lift L) (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3643 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Lift P (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1569 m · Carrying capacity/hour: 1800
Manufacturer: Poma

Tirol SBT (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 712 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Skazka (Lift H1) (YOC 2013)

6pers. High speed chairlift (detachable) with bubble
Length: 803 m · Carrying capacity/hour: 2200
Manufacturer: Poma

Kaban (Lift H2) (YOC 2013)

6pers. High speed chairlift (detachable) with bubble
Length: 765 m · Carrying capacity/hour: 2200
Manufacturer: Poma

Lift O (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 2206 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Lift W (YOC 2013)

4pers. High speed chairlift (detachable)
Length: 1427 m · Carrying capacity/hour: 1200
Manufacturer: Poma

Lift E (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 545 m · Carrying capacity/hour: 950
Manufacturer: Doppelmayr

Rosa Khutor (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 1200
Manufacturer: LST Loipolder

Rosa Khutor (Lift F) (YOC 2013)

J-bar
Carrying capacity/hour: 720
Manufacturer: Doppelmayr
All lifts

3-S Connection Psekhako A3: Alpika Service-Gazprom Mountain Resort (Laura) (YOC 2013)

30pers. Tricable ropeway
Length: 5386 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Esto Sadok (YOC 2013)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1033 m · Carrying capacity/hour: 2800
Manufacturer: Poma

Alpika Aibga-1 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1309 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

3-S Connection Psekhako A3: Alpika Service-Gazprom Mountain Resort (Laura) (YOC 2013)

30pers. Tricable ropeway
Length: 5386 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Gazprom Lift A2 (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Gazprom Lift M (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gazprom Lift G (YOC 2013)

6pers. High speed chairlift (detachable) with bubble
Length: 1500 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gazprom Lift F1 (YOC 2013)

6pers. High speed chairlift (detachable)
Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Gazprom Lift H (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 500 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gazprom Lift I (YOC 2013)

J-bar
Length: 500 m · Carrying capacity/hour: 720
Manufacturer: Doppelmayr
All lifts

Gorky Gorod K17 (YOC 2013)

4pers. Chairlift (fixed-grip) with bubble
Length: 357 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Gorky Gorod K18 (YOC 2013)

4pers. Chairlift (fixed-grip) with bubble
Length: 675 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

L2 Riverside (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2546 m · Carrying capacity/hour: 2165
Manufacturer: Leitner

L6 Qafqaz (YOC 2013)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1134 m · Carrying capacity/hour: 1800
Manufacturer: Leitner
All lifts

Shahdag Lift 6 (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 315 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Shahdag Lift 7 (YOC 2013)

J-bar
Length: 174 m · Carrying capacity/hour: 895
Manufacturer: Doppelmayr
All lifts

B10 (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2354 m · Carrying capacity/hour: 2400
Manufacturer: Poma

B13 (YOC 2013)

4pers. Chairlift (fixed-grip)
Length: 859 m · Carrying capacity/hour: 1800
Manufacturer: Poma
All lifts
1-7 out of 7 ski resorts