Change lift info:

Asia: new lifts 2011/2012

All new lifts in Asia for the 2011/2012 - season - new lifts at ski resorts in Asia : renewal of ski lifts or ski resort expansions in Asia


Overview: new ski lifts in Asia 2011/2012

Total: 29
7
19
3

Add lifts and cable cars? Please report here



Map: new lift in Asia

Show map
Asia – limit to

Asia – switch to

Asia: new ski lifts 2011/2012

1-16 out of 16 ski resorts

Lifos (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2495 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Hitit Tepe (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 2225 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Keven (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1853 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Karakulak (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1589 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr

Yalҫin (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 902 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

Sirt (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1434 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
All lifts

Gudauri 7 Gudaura (YOC 2011)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2360 m · Carrying capacity/hour: 2800
Manufacturer: Poma

Gudauri 6 Zuma (YOC 2011)

J-bar
Length: 318 m · Carrying capacity/hour: 600
Manufacturer: Poma
All lifts

Gulmarg Chair Lift Mid Station (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1200 m · Carrying capacity/hour: 1200
Manufacturer: Poma
All lifts

Hirafu Gondola (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1878 m · Carrying capacity/hour: 2400
Ski resort: Niseko United – Annapuri/Grand Hirafu/Hanazono/Niseko Village [Grand Hirafu]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

KL Lift M (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1195 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
All lifts

Lift 5 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 550 m · Carrying capacity/hour: 2024
Manufacturer: Doppelmayr

Lift 6 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1156 m · Carrying capacity/hour: 2220
Manufacturer: Doppelmayr
All lifts

Sichal Peak (YOC 2011)

6pers. Pulsed-movement aerial ropeway (gondola)
Length: 250 m · Carrying capacity/hour: 360

Chaman Gondola (YOC 2011)

4pers. Gondola lift (monocable circulating ropeway)
Length: 950 m · Carrying capacity/hour: 1800
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Ghalleh (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1100 m · Carrying capacity/hour: 1000
Replacement lift: 2pers. Chairlift (fixed-grip)

Upper Parking Lot (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 300 m · Carrying capacity/hour: 800
All lifts

Cankiri Ilgaz (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 1539 m · Carrying capacity/hour: 1200
Manufacturer: STM
All lifts

Lift F (YOC 2011)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1016 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Lift E (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 848 m · Carrying capacity/hour: 1820
Manufacturer: Doppelmayr

Lift L (YOC 2011)

6pers. High speed chairlift (detachable) with bubble
Length: 1220 m · Carrying capacity/hour: 1630
Manufacturer: Doppelmayr
Ski resort

Van-Gevas (YOC 2011)

2pers. Chairlift (fixed-grip)
Length: 1228 m · Carrying capacity/hour: 800
Manufacturer: STM
All lifts

Erzincan Ergan 1 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 2611 m · Carrying capacity/hour: 1500
Manufacturer: STM

Erzincan Ergan 2 (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 2392 m · Carrying capacity/hour: 1200
Manufacturer: STM
All lifts

Dorukkaya (YOC 2011)

4pers. High speed chairlift (detachable) with bubble
Length: 1160 m · Carrying capacity/hour: 1210
Manufacturer: Leitner
Ski resort

Bingöl (YOC 2011)

4pers. Chairlift (fixed-grip)
Length: 1000 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
All lifts

Betania (YOC 2011)

T-bar
Length: 600 m · Carrying capacity/hour: 1000
Manufacturer: Doppelmayr
All lifts

Merga Bute (YOC 2011)

T-bar
Length: 669 m · Carrying capacity/hour: 800
Manufacturer: STM
All lifts

Korek Teleferic (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3510 m · Carrying capacity/hour: 575
Manufacturer: Doppelmayr
Ski resort
1-16 out of 16 ski resorts