Change lift info:

Asia: new lifts 2008/2009

All new lifts in Asia for the 2008/2009 - season - new lifts at ski resorts in Asia : renewal of ski lifts or ski resort expansions in Asia


Overview: new ski lifts in Asia 2008/2009

Total: 12
1
6
5

Add lifts and cable cars? Please report here



Map: new lift in Asia

Show map
Asia – limit to

Asia – switch to

Asia: new ski lifts 2008/2009

1-10 out of 10 ski resorts

Sadzele (YOC 2008)

4pers. Chairlift (fixed-grip)
Length: 1504 m · Carrying capacity/hour: 1350
Manufacturer: Doppelmayr
All lifts

Lift A (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2022 m · Carrying capacity/hour: 2800
Manufacturer: Poma

Lift B (YOC 2008)

6pers. High speed chairlift (detachable) with bubble
Length: 1501 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

Lift A 1 (YOC 2008)

6pers. High speed chairlift (detachable)
Length: 970 m · Carrying capacity/hour: 3085
Manufacturer: Doppelmayr
All lifts

Kartepe T-Bar (YOC 2008)

T-bar
Length: 724 m · Carrying capacity/hour: 870
Manufacturer: STM
All lifts

Didveli 4 Slalom (YOC 2008)

T-bar
Length: 971 m · Carrying capacity/hour: 1008
Manufacturer: Leitner
All lifts

Orange (YOC 2008)

8pers. High speed chairlift (detachable)
Length: 526 m · Carrying capacity/hour: 3600
Manufacturer: Poma
All lifts

Saibei 1 (YOC 2008)

J-bar
Length: 647 m · Carrying capacity/hour: 900
Manufacturer: Leitner

Saibei 2 (YOC 2008)

J-bar
Length: 881 m · Carrying capacity/hour: 900
Manufacturer: Leitner
All lifts

Mustag (YOC 2008)

4pers. High speed chairlift (detachable) with bubble
Length: 1937 m · Carrying capacity/hour: 2300
Manufacturer: Doppelmayr
All lifts

Zeus (North Face 1) (YOC 2008)

3pers. Chairlift (fixed-grip)
Length: 680 m · Carrying capacity/hour: 1200
Manufacturer: Leitner
Replacement lift: T-bar
All lifts

Mus (YOC 2008)

T-bar
Length: 800 m · Carrying capacity/hour: 1000
Manufacturer: STM
Ski resort
1-10 out of 10 ski resorts