Change lift info:

Asia: new lifts 2006/2007

All new lifts in Asia for the 2006/2007 - season - new lifts at ski resorts in Asia : renewal of ski lifts or ski resort expansions in Asia


Overview: new ski lifts in Asia 2006/2007

Total: 32
1
7
20
4

Add lifts and cable cars? Please report here



Map: new lift in Asia

Show map
Asia – limit to

Asia – switch to

Asia: new ski lifts 2006/2007

1-15 out of 15 ski resorts

Isola Pair Lift 5 (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 498 m · Carrying capacity/hour: 1028
All lifts

Belvü (YOC 2006)

6pers. Pulsed-movement aerial ropeway (gondola)
Length: 419 m · Carrying capacity/hour: 429
Manufacturer: Doppelmayr

Kusaklikaya (YOC 2006)

4pers. High speed chairlift (detachable) with bubble
Length: 1547 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Cennetkaya 1 (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 581 m · Carrying capacity/hour: 1365
Manufacturer: Doppelmayr

Cennetkaya 2 (YOC 2006)

T-bar
Length: 864 m · Carrying capacity/hour: 944
Manufacturer: Doppelmayr
All lifts

High 1 (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2832 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Valley (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Mountain (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Athena (YOC 2006)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Zeus (YOC 2006)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Hera (YOC 2006)

6pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 3200
Manufacturer: Doppelmayr

Apollo (YOC 2006)

4pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Victoria (YOC 2006)

4pers. High speed chairlift (detachable)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

T-Bar (YOC 2006)

T-bar
Length: 302 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
All lifts

Didveli 2 Deka (YOC 2006)

4pers. High speed chairlift (detachable) with bubble
Length: 1100 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr
All lifts

Tsakhadzor IV (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 914 m · Carrying capacity/hour: 620
Manufacturer: Leitner
All lifts

Talgar III (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 784 m · Carrying capacity/hour: 989
Manufacturer: Doppelmayr

Talgar IV (YOC 2006)

J-bar
Length: 247 m · Carrying capacity/hour: 896
Manufacturer: Doppelmayr
All lifts

Saibei-Lift No. 4 (YOC 2006)

6pers. High speed chairlift (detachable) with bubble
Length: 1328 m · Carrying capacity/hour: 1400
Manufacturer: Leitner
All lifts

Mountain (YOC 2006)

8pers. High speed chairlift (detachable)
Length: 972 m · Carrying capacity/hour: 3400
Manufacturer: Poma

Flower (YOC 2006)

6pers. High speed chairlift (detachable)
Length: 480 m · Carrying capacity/hour: 3200
Manufacturer: Poma

Bird (YOC 2006)

4pers. High speed chairlift (detachable)
Length: 517 m · Carrying capacity/hour: 2400
Manufacturer: Poma
All lifts

Funky (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1190 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)
All lifts

Davraz 2 (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 931 m · Carrying capacity/hour: 1000
Manufacturer: STM
All lifts

Sheregesh (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3316 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Tanay Lift 1 (YOC 2006)

4pers. Chairlift (fixed-grip)
Length: 1351 m · Carrying capacity/hour: 1797
Manufacturer: Doppelmayr

Lift 15 (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 1700 m · Carrying capacity/hour: 1200

Tanay Lift 3 (YOC 2006)

T-bar
Length: 979 m · Carrying capacity/hour: 1162
Manufacturer: Doppelmayr
All lifts

Gora Belaya (YOC 2006)

4pers. High speed chairlift (detachable) with bubble
Length: 1598 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Ski resort

Tatvan 2 (YOC 2006)

2pers. Chairlift (fixed-grip)
Length: 2517 m · Carrying capacity/hour: 1250
Manufacturer: STM
Ski resort

Lift Nr. 12 (YOC 2006)

6pers. Gondola lift (monocable circulating ropeway)
Length: 2186 m · Carrying capacity/hour: 800
Manufacturer: Doppelmayr
Ski resort

Jinding (YOC 2006)

100pers. Aerial tramway/Reversible ropeway
Length: 1162 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: 56pers. Aerial tramway/Reversible ropeway
Ski resort
1-15 out of 15 ski resorts