Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Asia
Change region
Worldwide » Asia

Altinoran (YOC 2014)

2pers. Chairlift (fixed-grip)
Length: 200 m · Carrying capacity/hour: 1000

planned: Nr. 5 (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 499 m · Carrying capacity/hour: 2000

planned: Nr. 1 (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1871 m · Carrying capacity/hour: 2000

planned: Nr. 20 (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400

planned: Nr. 15 (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400

planned: Nr. 16 (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 1500 m · Carrying capacity/hour: 2400

planned: Nr. 19 (YOC 2014)

6pers. High speed chairlift (detachable)
Length: 2000 m · Carrying capacity/hour: 2400

planned: Nr. 12 (YOC 2014)

4pers. Chairlift (fixed-grip)
Length: 378 m · Carrying capacity/hour: 2000
Test Reports
Highlights
Slope offering, run variety
Lifts and cable cars
Ski Special • Tips for the ski holiday
Events
Kitzbuehel
2015-01-23 – 2015-01-25
Soelden
2015-04-23 – 2015-04-26
Lifts and Cable Cars
Zugspitze
Live Webcam
Welcome to the sportiest ski resort
The Montafon Total Speed Rush will be offered again this year for all sporty skiers. Conquer 36 kilometers and 8,000 meters elevation in the early morning and reward yourself afterwards with a hearty Alpine breakfast in the Kapellrestaurant. more...
Test Reports
Highlights
Advanced skiers, freeriders
Orientation (trail map, information boards, sign-postings)
Highlights
Families and children
Slope preparation
Austria | Ski resort Hochzillertal
As of December 2013, there will be a new 6-person chairlift and a new 8-person chairlift at Hochzillertal. Both lifts will be equipped with weather protectors and seat heaters. more...
Skiresort Partner