Change lift info:

3S lifts Tyrol (Tirol)

All 3-S lifts (tricable ropeway lifts) at ski resorts in Tyrol (Tirol) (3S in Tyrol (Tirol))


Description 3S lift

3-S ropeway lifts are a combination of a gondola lift and a reversible aerial tramway. These are detachable, circulating ropeway lifts with a capacity of up to 35 passengers per cabin and a transport capacity of up to 6,000 passengers/hour.


3S lifts/tricable ropeway lifts in Tyrol (Tirol)


Add lifts and cable cars? Please report here



Map: 3S lifts in Tyrol (Tirol)

Show map
Tyrol (Tirol) – limit to

Tyrol (Tirol) – switch to

Tyrol (Tirol): 3S lifts (8)

1-8 out of 8 ski resorts

Gaislachkoglbahn II (YOC 2010)

30pers. Tricable ropeway
Length: 1848 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Replacement lift: 24pers. Gondola lift (bicable circulating ropeway)
All lifts

Pardatschgratbahn (YOC 2014)

28pers. Tricable ropeway
Length: 3424 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Ski resort: Ischgl/Samnaun – Silvretta Arena [Ischgl]
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)
All lifts

planned: Hochzillertal <> Spieljoch (YOC 2019)

28pers. Tricable ropeway
Length: 3200 m · Carrying capacity/hour: 1800
Ski resort: Kaltenbach – Hochzillertal/​Hochfügen (SKi-optimal) [Hochzillertal]
All lifts

Penkenbahn (YOC 2015)

32pers. Tricable ropeway
Length: 2903 m · Carrying capacity/hour: 3840
Manufacturer: Doppelmayr
Ski resort: Mayrhofen – Penken/​Ahorn/​Rastkogel/​Eggalm [Mayrhofen – Penken]
Replacement lift: 15pers. Gondola lift (bicable circulating ropeway)
All lifts

Eisgratbahn 2 (YOC 2016)

32pers. Tricable ropeway
Length: 2249 m · Carrying capacity/hour: 3014
Manufacturer: Leitner
Replacement lift: 6pers. Gondola lift (bicable circulating ropeway)

Eisgratbahn 1 (YOC 2016)

32pers. Tricable ropeway
Length: 2437 m · Carrying capacity/hour: 3014
Manufacturer: Leitner
Replacement lift: 6pers. Gondola lift (bicable circulating ropeway)
All lifts

planned: Hochzillertal <> Spieljoch (YOC 2019)

28pers. Tricable ropeway
Length: 3200 m · Carrying capacity/hour: 1800
All lifts
1-8 out of 8 ski resorts