Change lift info:

Combined lifts Tiroler Zugspitz Arena

All combined lifts at ski resorts in the Tiroler Zugspitz Arena (CGD in the Tiroler Zugspitz Arena)


Description combined lift (Telemix)

This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously, whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.


Combined lifts/Telemix in the Tiroler Zugspitz Arena


Add lifts and cable cars? Please report here



Map: combined lifts in the Tiroler Zugspitz Arena

Show map
Tiroler Zugspitz Arena – switch to

Tiroler Zugspitz Arena: combined lifts (chair/gondola) (2)

1-2 out of 2 ski resorts

Almkopfbahn (YOC 2007)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1674 m · Carrying capacity/hour: 2040
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)
All lifts

planned: Gamskar-Bahn

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar
All lifts
1-2 out of 2 ski resorts