Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » North America » Canada » Ontario
Change region
Worldwide » North America » Canada » Ontario

6pers. chairlifts Ontario (11)

Summit Express (YOC 2002)

6pers. High speed chairlift (detachable)
Length: 984 m · Carrying capacity/hour: 3106
Manufacturer: Doppelmayr

Orchard Express (YOC 2013)

6pers. High speed chairlift (detachable)
Length: 740 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Silver Bullet Express (YOC 2003)

6pers. High speed chairlift (detachable)
Length: 901 m · Carrying capacity/hour: 3600
Manufacturer: Leitner

Southern Comfort (YOC 2000)

6pers. High speed chairlift (detachable)
Length: 1053 m · Carrying capacity/hour: 3600
Manufacturer: Poma

Century Express (YOC 1999)

6pers. High speed chairlift (detachable)
Length: 775 m · Carrying capacity/hour: 2800
Manufacturer: Poma

Weider Express (YOC 1997)

6pers. High speed chairlift (detachable)
Length: 759 m · Carrying capacity/hour: 3600
Manufacturer: Poma

planned: L-Hill Express

6pers. High speed chairlift (detachable)
Length: 1137 m · Carrying capacity/hour: 3000
Replacement lift: 3pers. Chairlift (fixed-grip)

Summit Six Express - D (YOC 2007)

6pers. High speed chairlift (detachable)
Length: 629 m · Carrying capacity/hour: 3600
Manufacturer: Leitner

Promenade Six Express - I (YOC 1999)

6pers. High speed chairlift (detachable)
Length: 714 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Adventure Six Express - F (YOC 1996)

6pers. High speed chairlift (detachable) Carrying capacity/hour: 3000

Wide Load (YOC 1997)

6pers. Chairlift (fixed-grip)
Length: 381 m · Carrying capacity/hour: 3600
Manufacturer: Leitner
Test Reports
Highlights
Lifts and cable cars
Families and children
Highlights
Slope preparation
Environmentally friendly ski operation
Ski Special • Tips for the ski holiday
Events
Hochzillertal
2014-12-07
Soelden
2015-04-23 – 2015-04-26
Kitzbuehel
2015-01-23 – 2015-01-25
Lifts and Cable Cars
Zugspitze
Live Webcam
The new 10-seater gondola lift Grubig II starts at the mid station and goes up to the Grubigstein. A perfect new lift to reach all the slopes very easy. more...
Test Reports
Highlights
Families and children
Slope preparation
Highlights
Slope preparation
Cross-country skiing and trails
Austria | St. Anton am Arlberg
The 94 cableways and lifts as well as 340 km runs distributed over the complete Arlberg area offer all possibilities. Keen winter sport fans from beginners up to professional, enjoy the varied Arlberg. more...
Skiresort Partner