Change lift info:

Germany: 8-person chairlifts

All 8-person chairlifts at ski resorts in Germany (Deutschland) (8 CLF/8 CLD in Germany (Deutschland))


Description 8-person chairlift

This extremely comfortable and modern lift system with 8 seats enables a very high transport capacity of up to 4,000 passengers/hour.


Eight-person chairlifts in Germany (Deutschland)


Add lifts and cable cars? Please report here



Map: chairlifts for 8 people in Germany (Deutschland)

Show map
Germany – limit to

Germany: eight-person chairlifts (7)

1-6 out of 6 ski resorts

Steinplattenbahn (YOC 2005)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1708 m · Carrying capacity/hour: 3800
Manufacturer: Doppelmayr
Ski resort: Steinplatte/​Winklmoosalm – Waidring/​Reit im Winkl [Steinplatte]
Replacement lift: 4pers. High speed chairlift (detachable) with bubble
All lifts

planned: Haupthangbahn (YOC 2017)

8pers. High speed chairlift (detachable) with bubble
Length: 950 m · Carrying capacity/hour: 2800
Replacement lift: T-bar
T-bar
All lifts

Schwandenbahn (YOC 2015)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 487 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Replacement lift: T-bar
T-bar
All lifts

Poppenberg (YOC 2015)

8pers. High speed chairlift (detachable)
Length: 472 m · Carrying capacity/hour: 4000
Manufacturer: Leitner
Replacement lift: 4pers. Chairlift (fixed-grip)
T-bar

Sürenberg-Winterberg (YOC 2012)

8pers. High speed chairlift (detachable)
Length: 449 m · Carrying capacity/hour: 3055
Manufacturer: Leitner
All lifts

planned: Köhlerhagen K 1 (YOC 2017)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1200 m · Carrying capacity/hour: 3000
Replacement lift: T-bar
T-bar
All lifts

planned: Sudelfeldkopf (YOC 2017)

8pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1320 m · Carrying capacity/hour: 3500
Replacement lift: T-bar
T-bar
All lifts
1-6 out of 6 ski resorts