Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe » Slovakia
Change region
Worldwide » Europe » Slovakia

6pers. chairlifts Slovakia (10)

Telemix Nova Hola (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1312 m · Carrying capacity/hour: 2570
Manufacturer: Poma

Lúčky-Priehyba (YOC 2013)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1878 m · Carrying capacity/hour: 2440
Manufacturer: Leitner

Zahrádky-Priehyba (YOC 2010)

6pers. High speed chairlift (detachable) with bubble
Length: 1285 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Zahradky-Rovná Holá (YOC 2003)

6pers. High speed chairlift (detachable) with bubble
Length: 1700 m · Carrying capacity/hour: 2700
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Na Flocha (YOC 2008)

6pers. High speed chairlift (detachable) with bubble
Length: 1087 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr

Spálena Doliná (YOC 2014)

6pers. High speed chairlift (detachable) with bubble
Length: 1958 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

planned: Interski (YOC 2015)

6pers. High speed chairlift (detachable) with bubble Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: J-bar , J-bar

Furkota (YOC 2009)

6pers. High speed chairlift (detachable)
Length: 1122 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Tatranská Lomnica-Štart 2 (YOC 2010)

6pers. High speed chairlift (detachable) with bubble and seat heating
Length: 1889 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr

Europe > Slovakia > Beskids

Velká Raca

Telemix Lalíky (YOC 2004)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1622 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Test Reports
Highlights
Lifts and cable cars
Beginners
Ski Special • Tips for the ski holiday
Events
Soelden
2015-04-23 – 2015-04-26
Lifts and Cable Cars
Steinplatte
Live Webcam
Austria | Ski resort Hochzillertal
As of December 2013, there will be a new 6-person chairlift and a new 8-person chairlift at Hochzillertal. Both lifts will be equipped with weather protectors and seat heaters. more...
Test Reports
Highlights
Slope preparation
Arrival, on-site parking
Highlights
Slope preparation
Slope offering, run variety
Austria | St. Anton am Arlberg
The 94 cableways and lifts as well as 340 km runs distributed over the complete Arlberg area offer all possibilities. Keen winter sport fans from beginners up to professional, enjoy the varied Arlberg. more...