Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Europe
Change region
Worldwide » Europe

Gondola lifts from 8 pers. Europe (634)

Gipfelbahn Hochwurzen (YOC 2013)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2170 m · Carrying capacity/hour: 2500
Manufacturer: Leitner
Ski resort: 4 Berge Skischaukel Schladming/Reiteralm-Hochwurzen-Planai-Hauser Kaibling (Hochwuzen)
Replacement lift: 15pers. Pulsed-movement aerial ropeway (gondola) , T-bar

Preunegg-Jet (YOC 2010)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 2102 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: T-bar

Golden Jet (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2430 m · Carrying capacity/hour: 2408
Manufacturer: Doppelmayr
Ski resort: 4 Berge Skischaukel Schladming/Reiteralm-Hochwurzen-Planai-Hauser Kaibling (Planai)
Replacement lift: 2pers. Chairlift (fixed-grip)

Reiteralm Silver-Jet (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1891 m · Carrying capacity/hour: 2770
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Hauser Kaiblingbahn (YOC 2000)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2525 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Hochwurzen Basic Jet (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1989 m · Carrying capacity/hour: 1640
Manufacturer: Doppelmayr
Ski resort: 4 Berge Skischaukel Schladming/Reiteralm-Hochwurzen-Planai-Hauser Kaibling (Hochwuzen)

Sunjet Hochwurzen (YOC 2008)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1444 m · Carrying capacity/hour: 2120
Manufacturer: Leitner
Ski resort: 4 Berge Skischaukel Schladming/Reiteralm-Hochwurzen-Planai-Hauser Kaibling (Hochwuzen)

Casa Cantoniera-Monte Gomito (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2086 m · Carrying capacity/hour: 3000
Manufacturer: Leitner

Kombibahn Karkogel (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1395 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Lenk-Metsch-Metschstand (Stand-Xpress) (YOC 2014)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3037 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 80pers. Aerial tramway/Reversible ropeway , 4pers. High speed chairlift (detachable)

Geils-Hahnenmoos (YOC 2013)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1413 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Gabiet-Passo dei Salati (YOC 1991)

12pers. Gondola lift (monocable circulating ropeway)
Length: 3013 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Stafal-Gabiet (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2566 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Crest-Alpe Ostafa (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1414 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Alagna-Pianalunga (YOC 2000)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2951 m · Carrying capacity/hour: 1400
Manufacturer: Agamatic

Moosfluh (YOC 1995)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1798 m · Carrying capacity/hour: 2200
Manufacturer: Garaventa
Ski resort: Aletsch Arena (Riederalp)

Bettmeralp-Bettmerhorn (YOC 1995)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2324 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Aletsch Arena (Bettmeralp)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Grand Rousses 2 (YOC 1986)

25pers. Gondola lift (bicable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Grand Rousses 1 (YOC 1986)

25pers. Gondola lift (bicable circulating ropeway)
Length: 1550 m · Carrying capacity/hour: 3000
Manufacturer: Poma

Alpette (YOC 1988)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1950 m · Carrying capacity/hour: 1600
Manufacturer: Poma

Poutran 2 (YOC 1987)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1338 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Poutran 1 (YOC 1987)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1400 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Télémixte des Jeux (YOC 2013)

Combined installation (8 pers. chair and 10 pers. gondola)
Length: 1388 m · Carrying capacity/hour: 3900
Manufacturer: Poma
Replacement lift: J-bar , J-bar

Rif Nel Express (YOC 2012)

Combined installation (6 pers. chair and 10 pers. gondola)
Length: 665 m · Carrying capacity/hour: 2700
Manufacturer: Leitner
Replacement lift: J-bar , J-bar

Seis - Seiseralm (YOC 2002)

16pers. Gondola lift (bicable circulating ropeway)
Length: 4300 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

St. Ulrich - Seiseralm (YOC 1998)

15pers. Gondola lift (bicable circulating ropeway)
Length: 1861 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Puflatsch (YOC 2009)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 970 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
Ski resort: Val Gardena (Alpe di Siusi)
Replacement lift: 1pers. Chairlift (fixed-grip)

Alpika Aibga-6 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1637 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-3 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1050 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-1 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1309 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-2 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1100 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpika Aibga-4 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola) Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Alpika Aibga-5 (YOC 2013)

Combined installation (4 pers. chair and 8 pers. gondola) Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Piz La Ila (YOC 2002)

15pers. Gondola lift (bicable circulating ropeway)
Length: 1837 m · Carrying capacity/hour: 2200
Manufacturer: Leitner

planned: Borest (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 2800
Replacement lift: 4pers. High speed chairlift (detachable)

Corvara-Piz Boé (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2641 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway)

Col Alto (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1017 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable)

Piz Sorega (YOC 2004)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1728 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable)

Frara (YOC 2002)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1493 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Replacement lift: T-bar , T-bar

Plans (YOC 2002)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1161 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Replacement lift: T-bar , T-bar

Col Pradat (YOC 2000)

8pers. Gondola lift (monocable circulating ropeway)
Length: 611 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Colfosco (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2368 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

Hochbifangbahn (YOC 2011)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2350 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Königslehen 2 (YOC 2004)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1145 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Königslehen 1 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1404 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Laghet-Prati di Gaggia (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1235 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Andalo-Doss Pelà (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2444 m · Carrying capacity/hour: 2600
Manufacturer: Doppelmayr
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Anzère-Tsalan-Pas de Maimbre (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2164 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Europe > Italy > Veneto

Arabba

Europa I (YOC 1989)

25pers. Gondola lift (bicable circulating ropeway)
Length: 1546 m · Carrying capacity/hour: 3400
Manufacturer: Agudio

Europa II (YOC 1989)

25pers. Gondola lift (bicable circulating ropeway)
Length: 1300 m · Carrying capacity/hour: 3400
Manufacturer: Agudio

Olympiagondolen (YOC 1989)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1610 m · Carrying capacity/hour: 2400
Manufacturer: Poma

VM8:AN (YOC 2006)

Combined installation (8 pers. chair and 8 pers. gondola)
Length: 1485 m · Carrying capacity/hour: 3400
Manufacturer: Leitner
Replacement lift: 4pers. High speed chairlift (detachable)

TC de Bochard (YOC 1996)

15pers. Gondola lift (monocable circulating ropeway)
Length: 2337 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Grands Montets (Chamonix)

Plan Joran (YOC 2014)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1608 m · Carrying capacity/hour: 3200
Manufacturer: Poma
Ski resort: Grands Montets (Chamonix)
Replacement lift: 4pers. High speed chairlift (detachable)

planned: B00 (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway) Carrying capacity/hour: 2400

B10 (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2403 m · Carrying capacity/hour: 2400
Manufacturer: Poma

planned: Alp Stätz (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1779 m · Carrying capacity/hour: 2200
Manufacturer: Bartholet BMF
Ski resort: Arosa-Lenzerheide (Lenzerheide)
Replacement lift: 3pers. Chairlift (fixed-grip)

Rothornbahn 1 (Canols-Scharmoin) (YOC 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1327 m · Carrying capacity/hour: 2200
Manufacturer: Garaventa
Ski resort: Arosa-Lenzerheide (Lenzerheide)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway) , 40pers. Aerial tramway/Reversible ropeway

Télécabine Ax-Bonascre (YOC 2002)

16pers. Gondola lift (monocable circulating ropeway)
Length: 2867 m · Carrying capacity/hour: 1100
Manufacturer: Poma

planned: Verbindungsbahn Axamer Lizum-Schlick 2000

8pers. Gondola lift (monocable circulating ropeway)

Azuga (YOC 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1753 m · Carrying capacity/hour: 2000
Manufacturer: Leitner

planned: Schlossalmbahn (YOC 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3422 m · Carrying capacity/hour: 3000
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 120pers. Funicular

Stubnerkogelbahn II (YOC 2009)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1043 m · Carrying capacity/hour: 2790
Manufacturer: Doppelmayr
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Stubnerkogelbahn I (YOC 2009)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1593 m · Carrying capacity/hour: 2790
Manufacturer: Doppelmayr
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Senderbahn Sektion II (YOC 2008)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1975 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Senderbahn Sektion I (YOC 2008)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 759 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Gastein)

Kaserebenbahn (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2063 m · Carrying capacity/hour: 1920
Manufacturer: Doppelmayr
Ski resort: Bad Hofgastein-Bad Gastein/Schlossalm-Angertal-Stubnerkogel (Bad Hofgastein)
Replacement lift: 2pers. Chairlift (fixed-grip) , T-bar

planned: Fis K70 (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)

planned: Wiesernock (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)

planned: Nockalmbahn (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1800 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Nationalparkbahn Brunnach (YOC 2001)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1887 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Replacement lift: 1pers. Chairlift (fixed-grip) , 1pers. Chairlift (fixed-grip)

Sternstein Express (YOC 2009)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1341 m · Carrying capacity/hour: 1850
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Seilbahn Mitterstein (YOC 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2398 m · Carrying capacity/hour: 2380
Manufacturer: Doppelmayr
Replacement lift: T-bar

Vallorcine (YOC 2004)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1520 m · Carrying capacity/hour: 2000
Manufacturer: Poma

Chalin Valog-Bunderishka Polyana Sektion 2 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2918 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Bansko-Chalin Valog Sektion 1 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3315 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Telecabina Baqueira I (YOC 2008)

9pers. Gondola lift (monocable circulating ropeway)
Length: 216 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Telecabina Baqueira II (YOC 2005)

9pers. Gondola lift (monocable circulating ropeway)
Length: 1025 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr

Jafferau-Frejusia (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1864 m · Carrying capacity/hour: 1780
Manufacturer: Doppelmayr

planned: Bayrischzell-Sudelfeld (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1450 m · Carrying capacity/hour: 2000
Replacement lift: 1pers. Chairlift (fixed-grip)

Belchenbahn (YOC 2001)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1106 m · Carrying capacity/hour: 1200
Manufacturer: Leitner

Almkopfbahn (YOC 2007)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1674 m · Carrying capacity/hour: 2040
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Marienberg 2 (YOC 2015)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

planned: Marienberg 1

10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400
Replacement lift: 6pers. High speed chairlift (detachable)

Europe > Russia

Big Wood

K6 Big Wood (YOC 2014)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1615 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF

planned: Bjelasnica (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3500 m · Carrying capacity/hour: 2000

Kühmatte (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1892 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Bormio-Bormio 2000 (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2439 m · Carrying capacity/hour: 2800
Manufacturer: Leitner

Sella Nevea-Rifugio Gilberti (YOC 2007)

16pers. Gondola lift (bicable circulating ropeway)
Length: 1970 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Ski resort: Bovec/Kanin-Sella Nevea (Sella Nevea)

Gondolen Bränas (YOC 1988)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1349 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Palüdbahn (YOC 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1604 m · Carrying capacity/hour: 1430
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Dorfbahn Brand (YOC 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1120 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

TC Chamonix-Plan Praz (YOC 2008)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1832 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Brévent-Flégère (Le Brévent)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Bursa-Uludağ 1+2+3 (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway)
Length: 8800 m · Carrying capacity/hour: 1520
Manufacturer: Leitner
Replacement lift: 50pers. Aerial tramway/Reversible ropeway

Tasso-Monte Curcio (YOC 2001)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1810 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

planned: Rarau 2 (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1397 m · Carrying capacity/hour: 1000
Manufacturer: Leitner

Rarau 1 (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2512 m · Carrying capacity/hour: 1000
Manufacturer: Leitner
Replacement lift: J-bar

Canazei-Pecol (YOC 1992)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1367 m · Carrying capacity/hour: 2400
Manufacturer: Agamatic

Toè-Col dei Rossi (YOC 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1226 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Pian Frataces/Lupo Bianco (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1965 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Pradel-Rodella (YOC 1992)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2450 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Kabinenbahn Welschnofen Laurin 1-Frommer Alm (YOC 2013)

10pers. Gondola lift (monocable circulating ropeway)
Length: 3603 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Hubertus (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1195 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Le Lys (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3745 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Puntas (YOC 1995)

8pers. Gondola lift (monocable circulating ropeway)
Length: 414 m · Carrying capacity/hour: 1130
Manufacturer: Doppelmayr

Doss dei Laresi - Cermis (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2446 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: 37pers. Aerial tramway/Reversible ropeway

Masi di Cavalese-Doss dei Laresi (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2140 m · Carrying capacity/hour: 2195
Manufacturer: Leitner

Cavalese - Masi di Cavalese (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 567 m · Carrying capacity/hour: 2195
Manufacturer: Leitner

La Croix (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1980 m · Carrying capacity/hour: 2800
Manufacturer: Poma
Replacement lift: 40pers. Aerial tramway/Reversible ropeway

Charmey-Vounetz (Rapido Sky) (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3146 m · Carrying capacity/hour: 1200
Manufacturer: Garaventa

Canin (YOC 2007)

16pers. Gondola lift (bicable circulating ropeway)
Length: 1970 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Europe > Italy > Veneto

Civetta

Pecol-Crep di Pecol (YOC 1989)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1154 m · Carrying capacity/hour: 3600
Manufacturer: Leitner
Ski resort: Civetta (Zoldo Alto/Val di Zoldo)

Piani di Pezzè-Col dei Baldi (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1985 m · Carrying capacity/hour: 2800
Manufacturer: Leitner
Ski resort: Civetta (Alleghe/Prà della Costa)
Replacement lift: 4pers. High speed chairlift (detachable)

planned: St-Moritz-Hahnensee (YOC 2017)

8pers. Gondola lift (monocable circulating ropeway)

Dolonne-Plan Checrouit (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1375 m · Carrying capacity/hour: 2480
Manufacturer: Leitner

Crans-Cry d'Er (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3138 m · Carrying capacity/hour: 1400
Manufacturer: Garaventa

Donnerkogelbahn (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2060 m · Carrying capacity/hour: 2000
Ski resort: Dachstein West (Annaberg im Lammertal)
Replacement lift: 2pers. Chairlift (fixed-grip)

Panorama Jet Zwieselalm I+II (YOC 2004)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2296 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Dachstein West (Gosau)
Replacement lift: 2pers. Chairlift (fixed-grip) , 2pers. Chairlift (fixed-grip)

Hornbahn (YOC 1992)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2654 m · Carrying capacity/hour: 1882
Manufacturer: Doppelmayr
Ski resort: Dachstein West (Russbach)

planned: Mellaubahn

10pers. Gondola lift (monocable circulating ropeway)
Length: 2040 m · Carrying capacity/hour: 3000
Ski resort: Damüls-Mellau (Mellau)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Gipfelbahn (YOC 2009)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1851 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Damüls-Mellau (Mellau)

Télémix Fontettes (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2267 m · Carrying capacity/hour: 2216
Manufacturer: Poma
Replacement lift: 4pers. Chairlift (fixed-grip)

Dombai 1 (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1810 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Telemix Nova Hola (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1312 m · Carrying capacity/hour: 2570
Manufacturer: Poma

Gsoll-Jet (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1626 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Ehrwalder Almbahn (YOC 2001)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2275 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

planned: Gamskar-Bahn (YOC 2014)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 2030 m · Carrying capacity/hour: 2000
Replacement lift: T-bar

planned: Engelberg-Trübsee (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2685 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

planned: Trübsee-Stand (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1996 m · Carrying capacity/hour: 2400
Manufacturer: Garaventa

planned: Solaise (YOC 2016)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1990 m · Carrying capacity/hour: 3000
Ski resort: Espace Killy/Val d'Isère-Tignes (Val d'Isère)
Replacement lift: 48pers. Aerial tramway/Reversible ropeway , 4pers. High speed chairlift (detachable) with bubble

La Tovière (YOC 2013)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1793 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Espace Killy/Val d'Isère-Tignes (Tignes)
Replacement lift: 10pers. Gondola lift (monocable circulating ropeway)

Les Boisses (YOC 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1161 m · Carrying capacity/hour: 3000
Manufacturer: Doppelmayr
Ski resort: Espace Killy/Val d'Isère-Tignes (Tignes)
Replacement lift: 2pers. Chairlift (fixed-grip)

Molanès (YOC 2009)

10pers. Gondola lift (monocable circulating ropeway)
Length: 923 m · Carrying capacity/hour: 2000
Manufacturer: Poma
Ski resort: Espace Lumière (Pra-Loup)

Clappe Télémix (YOC 2013)

Combined installation (6 pers. chair and 10 pers. gondola)
Length: 1261 m · Carrying capacity/hour: 2665
Manufacturer: Poma
Ski resort: Espace Lumière (Pra-Loup)
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway) , 3pers. Chairlift (fixed-grip)

Les Suches (YOC 1988)

20pers. Gondola lift (bicable circulating ropeway)
Length: 1717 m · Carrying capacity/hour: 3000
Manufacturer: Augudio
Ski resort: Espace San Bernardo/La Thuile-La Rosière (La Thuile)

Cote 2000 (YOC 2010)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1830 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Espace Villard Corrençon (Villard de Lans)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Ried-Fendels (YOC 1997)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1640 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr

Reckmoos Nord (YOC 2011)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 1860 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Reckmoos Süd (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1730 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr

Doischberg (YOC 2001)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1528 m · Carrying capacity/hour: 1900
Manufacturer: Leitner
Replacement lift: T-bar

Flying Mozart 1 (YOC 1993)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1053 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Flachau-Wagrain-Alpendorf (Wagrain/Grießenkareck)

Flying Mozart 2 (YOC 1988)

10pers. Gondola lift (monocable circulating ropeway)
Length: 2049 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Flachau-Wagrain-Alpendorf (Wagrain/Grießenkareck)

achterjet (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2992 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Flachau-Wagrain-Alpendorf (Flachau)
Replacement lift: 8pers. Gondola lift (monocable circulating ropeway)

Grafenberg Express I (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 947 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Flachau-Wagrain-Alpendorf (Wagrain/Grafenberg)

Buchau Gipfelbahn (YOC 2007)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2200 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Flachau-Wagrain-Alpendorf (Alpendorf)

Wagrainer Höhebahn/Rote 8er I (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1123 m · Carrying capacity/hour: 2400
Manufacturer: Girak
Ski resort: Flachau-Wagrain-Alpendorf (Wagrain/Grießenkareck)
Replacement lift: 2pers. Chairlift (fixed-grip)

Wagrainer Höhebahn/Rote 8er II (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2365 m · Carrying capacity/hour: 2400
Manufacturer: Girak
Ski resort: Flachau-Wagrain-Alpendorf (Wagrain/Grießenkareck)
Replacement lift: 3pers. High speed chairlift (detachable)

Prodalp (YOC 1992)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1460 m · Carrying capacity/hour: 2400
Manufacturer: Bartholet BMF

planned: Maschgenkamm (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3298 m · Carrying capacity/hour: 2400
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Oberterzen-Tannenboden (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2231 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

Unterterzen-Oberterzen (YOC 2005)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1198 m · Carrying capacity/hour: 1500
Manufacturer: Doppelmayr

planned: Folgaria-Francollini-Sommo Alto (YOC 2014)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2500 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Montebello (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway) Carrying capacity/hour: 2400

planned: Metzenjochbahn (YOC 2014)

8pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 2100 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

planned: Verbindungsbahn Axamer Lizum-Schlick 2000

8pers. Gondola lift (monocable circulating ropeway)

planned: Breitspitzbahn (YOC 2015)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1815 m · Carrying capacity/hour: 2400
Replacement lift: 2pers. Chairlift (fixed-grip)

Alpkogelbahn (YOC 2004)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1399 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: T-bar

Schafbergbahn (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2200 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip) , 1pers. Chairlift (fixed-grip)

Kreuzeckbahn (YOC 2002)

15pers. Gondola lift (bicable circulating ropeway)
Length: 2318 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr
Replacement lift: 30pers. Aerial tramway/Reversible ropeway

Hausbergbahn (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2036 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Replacement lift: 70pers. Aerial tramway/Reversible ropeway

Gazprom Lift A2 (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway) Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Gazprom Lift M (YOC 2013)

8pers. Gondola lift (monocable circulating ropeway) Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gazprom VIP (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2680 m · Carrying capacity/hour: 150
Manufacturer: Doppelmayr

Gazprom Lift A1 (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2879 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Gazprom Lift A (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2880 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Schillingbahn (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2045 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Ski resort: Gitschberg Jochtal (Jochtal)
Replacement lift: J-bar , J-bar

Gaisjochbahn (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1960 m · Carrying capacity/hour: 800
Manufacturer: Leitner
Ski resort: Gitschberg Jochtal (Gitschberg)

Bergbahn (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1571 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Ski resort: Gitschberg Jochtal (Gitschberg)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Nesselbahn (YOC 2002)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1678 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Gitschberg Jochtal (Gitschberg)
Replacement lift: T-bar

Jochtal (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1862 m · Carrying capacity/hour: 1800
Manufacturer: Agamatic
Ski resort: Gitschberg Jochtal (Jochtal)

Golmerbahn 3 (YOC 1995)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1201 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 48pers. Funicular

Golmerbahn 2 (YOC 1995)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1266 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Golmerbahn 1 (YOC 1995)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1555 m · Carrying capacity/hour: 1800
Manufacturer: Doppelmayr
Replacement lift: 48pers. Funicular

Gornaya Karusel 3 (Tremplins) (YOC 2012)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Gornaya Karusel 2 (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1500 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Gornaya Karusel 1 (YOC 2009)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2000 m · Carrying capacity/hour: 1500
Manufacturer: Poma

Ley (YOC 2010)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1000 m · Carrying capacity/hour: 2400
Manufacturer: Poma

Bézou (YOC 2004)

10pers. Gondola lift (monocable circulating ropeway)
Length: 814 m · Carrying capacity/hour: 2700
Manufacturer: Poma

Grächen-Hannigalp (Märchengondelbahn) (YOC 2011)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2323 m · Carrying capacity/hour: 2000
Manufacturer: Garaventa
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

Füssener Jöchl (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2610 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: 2pers. Chairlift (fixed-grip)

Tarter (YOC 2004)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1177 m · Carrying capacity/hour: 3000
Manufacturer: Poma
Ski resort: Grandvalira (El Tarter)

Canillo (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1720 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Grandvalira (Canillo)

Soldeu (YOC 1996)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1430 m · Carrying capacity/hour: 2400
Manufacturer: Poma
Ski resort: Grandvalira (Soldeu)

Grimentz-Bendolla (YOC 1988)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1320 m · Carrying capacity/hour: 1600
Manufacturer: Von Roll
Ski resort: Grimentz-Zinal (Grimentz)

planned: Grund-Männlichen (YOC 2016)

8pers. Gondola lift (monocable circulating ropeway)
Length: 6000 m · Carrying capacity/hour: 1800
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway)

Seis - Seiseralm (YOC 2002)

16pers. Gondola lift (bicable circulating ropeway)
Length: 4300 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

St. Ulrich - Seiseralm (YOC 1998)

15pers. Gondola lift (bicable circulating ropeway)
Length: 1861 m · Carrying capacity/hour: 2400
Manufacturer: Leitner

Ciampinoi (YOC 2009)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1860 m · Carrying capacity/hour: 2400
Manufacturer: Agamatic
Ski resort: Val Gardena (Selva di Gardena)
Replacement lift: 12pers. Gondola lift (monocable circulating ropeway) , 12pers. Gondola lift (monocable circulating ropeway)

Saslong (YOC 1990)

12pers. Gondola lift (monocable circulating ropeway)
Length: 1838 m · Carrying capacity/hour: 2200
Manufacturer: Leitner
Ski resort: Val Gardena (St. Christina)

Dantercepies (YOC 2013)

10pers. Gondola lift with seat heating (monocable circulating ropeway)
Length: 2667 m · Carrying capacity/hour: 3000
Manufacturer: Leitner
Ski resort: Val Gardena (Selva di Gardena)
Replacement lift: 6pers. Gondola lift (monocable circulating ropeway)

St. Christina-Col Raiser (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2334 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Ski resort: Val Gardena (St. Christina)
Replacement lift: 8pers. Gondola lift (monocable circulating ropeway)

Ortisei-Furnes (YOC 1999)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2558 m · Carrying capacity/hour: 1600
Manufacturer: Leitner
Ski resort: Val Gardena (St. Ulrich)

Puflatsch (YOC 2009)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 970 m · Carrying capacity/hour: 2200
Manufacturer: Doppelmayr
Ski resort: Val Gardena (Alpe di Siusi)
Replacement lift: 1pers. Chairlift (fixed-grip)

Hochbrand (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1164 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
Ski resort: Großarltal-Dorfgastein (Großarl)
Replacement lift: 2pers. Chairlift (fixed-grip)

Kals I (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2539 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Ski resort: Großglockner Resort Kals-Matrei (Kals)

Kals II (YOC 2008)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1257 m · Carrying capacity/hour: 1600
Manufacturer: Doppelmayr
Ski resort: Großglockner Resort Kals-Matrei (Kals)

Goldried (YOC 1998)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3120 m · Carrying capacity/hour: 2000
Manufacturer: Leitner
Ski resort: Großglockner Resort Kals-Matrei (Matrei in Osttirol)

Großglockner Panoramabahn (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1146 m · Carrying capacity/hour: 1200
Manufacturer: Doppelmayr
Replacement lift: 1pers. Chairlift (fixed-grip)

Kasbergbahn (YOC 2003)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1784 m · Carrying capacity/hour: 1920
Manufacturer: Doppelmayr
Replacement lift: 4pers. High speed chairlift (detachable)

Cavadura-Schwänzelegg (2. Sektion) (YOC 1992)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2165 m · Carrying capacity/hour: 1300
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Grüsch-Cavadura (1. Sektion) (YOC 1992)

8pers. Gondola lift (monocable circulating ropeway)
Length: 1462 m · Carrying capacity/hour: 1300
Manufacturer: Leitner
Replacement lift: 2pers. Chairlift (fixed-grip)

Rougemont-La Videmanette (YOC 2010)

8pers. Gondola lift (monocable circulating ropeway)
Length: 3100 m · Carrying capacity/hour: 1400
Manufacturer: Doppelmayr
Replacement lift: 4pers. Gondola lift (monocable circulating ropeway) , 4pers. Gondola lift (monocable circulating ropeway)

Ny Heis Gondola (YOC 2006)

8pers. Gondola lift (monocable circulating ropeway)
Length: 2490 m · Carrying capacity/hour: 2800
Manufacturer: Doppelmayr

planned: Hemsedal Gondola

8pers. Gondola lift (monocable circulating ropeway)

Hirschkogelbahn (YOC 2012)

10pers. Gondola lift (monocable circulating ropeway)
Length: 1664 m · Carrying capacity/hour: 2400
Manufacturer: Leitner
Replacement lift: T-bar
Test Reports
Highlights
Advanced skiers, freeriders
Orientation (trail map, information boards, sign-postings)
Highlights
Ski resort size
Slope offering, run variety
Ski Special • Tips for the ski holiday
Video
Schmitten
Photos
Events
Silvretta Montafon
2014-12-04 – 2014-12-14
Soelden
2015-04-23 – 2015-04-26
Kitzbuehel
2015-01-23 – 2015-01-25
Lifts and Cable Cars
Zugspitze
Live Webcam
Ski - Fun - Wellness - Lifestyle
Katschberg/Rennweg region has something to offer for everyone with a wide choice of sports and leisure activities with something to suit everyone. The winter sports season commences in early December through to spring. more...
Austria | Kids up on the Mountain, Prices “down in the valley“
In Top Form for Families: St. Jakob in the Defereggental Ski Centre gets the kids on their skis and the whole family in swing with children’s prices through 18 years of age. more...
Skiresort Partners