planned: Mont Blanc 2 (YOC 2015)
100pers. Aerial tramway/ Reversible ropeway
Length: 2600 m · Carrying capacity/hour: 900
Replacement lift: 23pers. Aerial tramway/ Reversible ropeway
, 8pers. Aerial tramway/ Reversible ropeway
planned: Mont Blanc 1 (YOC 2014)
100pers. Aerial tramway/ Reversible ropeway
Length: 1900 m · Carrying capacity/hour: 900
Replacement lift: 31pers. Aerial tramway/ Reversible ropeway
La Palud-Pavillon (YOC 1946)
31pers. Aerial tramway/ Reversible ropeway
Length: 1809 m · Carrying capacity/hour: 300
Pavillon-Rifugio Torino (YOC 1947)
23pers. Aerial tramway/ Reversible ropeway
Length: 2441 m · Carrying capacity/hour: 220
Rifugio Torino-Punta Helbronner (YOC 1957)
8pers. Aerial tramway/ Reversible ropeway
Length: 270 m · Carrying capacity/hour: 200