Worldwide
Continent
Country (optional)
Region (optional)
Holiday region (optional)
Worldwide » Asia
Change region
Worldwide » Asia

Combined installation Asia (8)

Chimbulak 2 (YOC 2010)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1163 m · Carrying capacity/hour: 1900
Manufacturer: Leitner

Chimbulak 1 (YOC 2010)

Combined installation (4 pers. chair and 8 pers. gondola)
Length: 1875 m · Carrying capacity/hour: 1900
Manufacturer: Leitner

Lift 1 (YOC 2012)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1936 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr

Gorny Vozdukh 2 (YOC 2007)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 965 m · Carrying capacity/hour: 2000
Manufacturer: Doppelmayr

Masters (YOC 2005)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 934 m · Carrying capacity/hour: 1875
Manufacturer: Doppelmayr

Qafqaz 6 (YOC 2013)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1134 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Qafqaz 5 (YOC 2012)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1176 m · Carrying capacity/hour: 1800
Manufacturer: Leitner

Yabuli Shuttle Express (YOC 2007)

Combined installation (4 pers. chair and 6 pers. gondola)
Length: 1344 m · Carrying capacity/hour: 2475
Manufacturer: Doppelmayr
Test Reports
Highlights
Slope offering, run variety
Families and children
Highlights
Slope preparation
Families and children
Ski Special • Tips for the ski holiday
Events
Soelden
2015-04-23 – 2015-04-26
Lifts and Cable Cars
Zugspitze
Live Webcam
Current Info
http://www.skiresort.info/ski-resort/ski-jewel-alpbachtal-wildschoenau/
The new ski resort shines now under the name "Ski Jewel Alpbachtal Wildschoenau" with the new connection lift from Alpbachtal to the Schatzberg (Wildschönau). more...
Test Reports
Highlights
Slope preparation
Families and children
Highlights
Slope preparation
Arrival, on-site parking
The new 10-seater gondola lift Grubig II starts at the mid station and goes up to the Grubigstein. A perfect new lift to reach all the slopes very easy. more...