Select region
close
Continent
Country (optional)
Region (optional)
Change lift info:

China Combined lifts China

All combined lifts at ski resorts in China (CGD in China)


Description combined lift (Telemix)

This innovative ropeway system combines the advantages of a detachable gondola lift with those of a detachable chairlift. Gondolas and chairs are used simultaneously., whereby the boarding and exiting areas are separate and the requirements of the individual lift types are met.


Combined lifts/Telemix in China

2 in operation Details

Add lifts and cable cars? Please report here



China - expand to (number of combined lifts):

Map: combined lifts in China

China - limit to (number of combined lifts):

China China: combined lifts (chair/gondola) (2)

1-2 out of 2 ski resorts

Lift 1 (YOC 2012)

Combined installation (6 pers. chair and 8 pers. gondola)
Length: 1936 m · Carrying capacity/hour: 2400
Manufacturer: Doppelmayr
All lifts

Yabuli Shuttle Express (YOC 2007)

Combined installation (4 pers. chair and 6 pers. gondola)
Length: 1344 m · Carrying capacity/hour: 2475
Manufacturer: Doppelmayr
All lifts
    1-2 out of 2 ski resorts